My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MADISON
>
420
>
2900 - Site Mitigation Program
>
PR0521765
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 4:33:59 PM
Creation date
5/6/2019 4:23:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0521765
PE
2950
FACILITY_ID
FA0014781
FACILITY_NAME
CARANDO MACHINE WORKS
STREET_NUMBER
420
STREET_NAME
MADISON
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
420 N MADISON ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Treadwdl&Rdlo <br /> bgs. Soil and groundwater collected at 23 feet in the base of the excavation contained TPH g <br /> concentrations of 11 mg/kg and 16,000 micrograms per liter(ug/1)respectively. <br /> 4.2 Proposed Remediation <br /> The site development planned for this coming spring will limit future site access around sample <br /> location CPT-EXC-BT-19 for future monitoring or in-situ remediation efforts. Consequently, <br /> we propose to excavate the contaminated soil in the area as shown on Figure 3. The proposed <br /> excavation is 25 feet long by 10 feet wide by 2.5.feet deep. The scope of the work is similar to <br /> the work performed at the adjacent shored excavation. The proposed excavation would be <br /> extended to approximately 6.5 feet below the groundwater.table (18.5 feet bgs) in order to <br /> I <br /> remove contaminated groundwater,and contaminated saturated:soil. During excavation <br /> I <br /> backfilling, approximately 800 pounds of oxygen release compound(ORC)would be placed into <br /> the excavation to assist with enhanced bioremediation of groundwater downgradient of the <br /> excavation, and to address deeper soil contamination that may be present. <br /> } <br /> The excavation dimensions were determined after considering the previous and current soil and <br /> groundwater analytical data and the geologic and hydrogeologic data gathered during our recent <br /> investigations and excavation work,as described below. The western portion of the excavation <br /> is bounded by Boring CSB-5, which.did not have significant TPH g concentrations, and by the <br /> previous excavation to the north. The excavation extends to the edge of the previous excavation <br /> to the east. We anticipate that contaminant concentrations in soil and groundwater will decrease <br /> in the westerly, upgradient location (no TPJ-1=g was detected in groundwater in CSB-4, located <br /> 30 feet west of the excavation),and are proposing to extend the excavation 10 feet west of the <br /> edge of the former excavation. Shoring will be.required due to the presence of Fremont Street, <br /> and because of the proposed excavation depth below the water table. <br /> 4 <br /> Residual soil impacts identified deeper than 25 feet bgs will be addressed by backfilling with <br /> ORC. Excavation below 25 feet bgs will not be attempted because the shored excavation will be <br /> t <br /> 5 <br /> 25970122.DGD 14 February 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.