My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MADISON
>
420
>
2900 - Site Mitigation Program
>
PR0521765
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 4:33:59 PM
Creation date
5/6/2019 4:23:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0521765
PE
2950
FACILITY_ID
FA0014781
FACILITY_NAME
CARANDO MACHINE WORKS
STREET_NUMBER
420
STREET_NAME
MADISON
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
420 N MADISON ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"ts <br /> EXPLANATION <br /> WEST FREMONT STREET <br /> Excavation Area Approximate location of boring by <br /> 43'x 14'x 25'deep CSB-11 Treadwell&Rollo,Inc.,January 2004 <br /> CSB-3 Former Carando <br /> B-1-+-Approximate location of boring and <br /> Advanced <br /> _ GeoErnrironmental,Inc.,June and Juty 2003 <br /> 1- / y Building Location Approximate of test pit location and number <br /> TP-C® by Treadwell&Rolla,Inc.,2004 <br /> ' <br /> TP-A Test p location removed during excavation <br /> it In <br /> CPT-EXC-N15 O Approximate location of confirmation ssMple 1 <br /> O ESC .T byTrezdwelt&Rollo,Inc.,2004 <br /> CPT-PI-A4 Sampled locations removed during excavation <br /> CSB-5 <br /> Appfox rr>ate Location of 5 to 10 feet geotechnical excavation <br /> rL Forcner;Gas Station <br /> f Pump.l'slands 23,feet deep excavation <br /> ¢PT-EXCrWB 1 "TP a TQ C I Pum Island Excavation, <br /> D110-foot average depth <br /> I- <br /> © Former Underground Storage Tank <br /> removed 28Apri12004 <br /> - L- <br /> `-• '. '(.SB-6 r _ CPT Pf-84 <br /> ® Proposed excavation area <br /> CPT P1=B70 , <br /> cPY'Ez sio <br /> CPT-EXGBTI2,, <br /> a <br /> CSB-4 <br /> CPT-PI-A4 Pump,ISlandEzcaVaUbn <br /> CPT=PI A7 25'.x 22 x 10'[Jeep <br /> p <br /> W <br /> o _ 0 10 Feet <br /> I <br /> o <br /> Approximate scale <br /> _ to' <br /> n <br /> `o I I. .. - Refeence:eesamap from Sleglried Engineering,Inc.,1999. <br /> SOIL AND GROUNDWATER REMEDIATION REPORT <br /> FORMER CARANDO MACHINE SHOP <br /> Stockton,Califomia <br /> Forme[Service Station Bu'Iding <br /> p I I, <br /> I <br /> PREVIOUS AND PROPOSED <br /> p l j EXCAVATION AREA <br /> i , <br /> � I I Date 02/1x/05 Project No. 2597.10 Figure 2 <br /> 11r�atiwell8�olb <br />
The URL can be used to link to this page
Your browser does not support the video tag.