My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MADISON
>
420
>
2900 - Site Mitigation Program
>
PR0521765
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 4:33:59 PM
Creation date
5/6/2019 4:23:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0521765
PE
2950
FACILITY_ID
FA0014781
FACILITY_NAME
CARANDO MACHINE WORKS
STREET_NUMBER
420
STREET_NAME
MADISON
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
420 N MADISON ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If a well extends below 50 ft,centralizers should be installed at 50 ft and every 50 ft <br /> thereafter except within screened interval and bentonite seal. Centralizer material <br /> will be PVC,PTFE,or stainless steel. Centralizer material should be of the same <br /> material as the well screen. <br /> • Cut the riser with a pipe cutter approximately 2-2.5 ft above grade. All pipe cuts <br /> MUST be square to ensure that the elevation between the highest and lowest point of <br /> the well casing is less than or equal to 0.02 ft. Notch,file,orotherwise scribe a <br /> permanent reference point on the top of the casing. <br /> • If a flush-mounted well is required at a given location,an internal pressure cap must <br /> be used to ensure that rainwater cannot pool ground the wellhead and enter the well <br /> through the cap. <br /> • When the well is set to the bottom of the hole,temporarily place a cap on top of the <br /> pipe to keep the.well interior clean. <br /> • Place the appropriate filter pack. Monitor the rise annulus with a weighted tape to <br /> assure that bridging is not occurring. <br /> • After the pack is in place,wait three to five minutes for the material to settle,tamp <br /> and level a capped PVC pipe, and check its depth with a weighted steel tape. <br /> • Install the bentonite seal(2 ft to 5 ft thick)by dropping bentonite pellets into the hole <br /> gradually. If the well is deeper than 30 feet,a tremie pipe should be used to place <br /> either bentonite pellets or slurry. <br /> • Wait for the pellets to hydrate and swell. Hydration times will be determined by field <br /> test or by manufacturer's instructions. Normally this will be 30 to 45 minutes. <br /> Document the hydration time in the field notebook. If the pellets are above the water <br /> level in the hole,add several buckets of clean water to the boring. Document the <br /> amount of water added to the hole. <br /> • Mix an appropriate cement-bentonite slurry. Be sure the mixture is thoroughly mixed <br /> and as thick as is practicable. <br /> • Lower a side discharge tremie pipe into the annulus to the level of the pellet seal. <br /> • Pump the grout slurry into the annulus while withdrawing the tremie pipe and <br /> temporary casing. <br /> • Continue the grout fill to the ground surface. -Seat the protective casing in the grout, <br /> allowing no more than 0.2 ft between the top of the well casing and the bottom of the <br /> protective casing cap. Lock the cap. <br /> Page 8 of 9 <br /> welUnstall_SOP MONITORING WELL INSTALLATION February 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.