Laserfiche WebLink
I CSB-2 <br /> EXPLANATION <br /> 17,000,12,000 CSB-3 CSB-1 + Approximate location of proposed boring <br /> MW-3* Approximate location of monitoring well <br /> MW 8 CSB-5 1 I - Previous Gas Station Pump -- - - — Parcel boundary <br /> -_--- CSB-6 B-6 17,000,12,000 TPHg,TPH-d(ug/1)for groundwater samples <br /> CSB-1 ND from advanced GeoEnvironmental <br /> CSB-4 on 27 June 2003 <br /> r---j Previous building and gas station footprint <br /> ■ <br /> MW-4 L—J from 1964 Air Photo <br /> ND MW-18 r---------_---r I <br /> ND I <br /> B-2 I I I <br /> 1 I I I <br /> ■ NDT I I <br /> L------------J <br /> I > Former Service Station <br /> I ND <br /> ■ I / B <br /> ND I <br /> I I I <br /> I I I <br /> --I I <br /> MW-1 <br /> I <br /> I_ <br /> ■ i <br /> ■ <br /> / I <br /> Former I i <br /> Tank No.2 / l I <br /> T 1 <br /> NDf <br /> I / <br /> I /I l <br /> ■ / <br /> I <br /> I / 30 Feet <br /> I <br /> I I <br /> 1 Approximate scale <br /> ■ T B-5 <br /> v ! ND <br /> o r <br /> M <br /> b <br /> ■ / NORTH SHORE <br /> ■ <br /> Ua vA \ srockroN HouslNc <br /> j AND REDEVktAR <br /> T <br /> MENT <br /> Stockton,California <br /> CARANDO SITE AND <br /> t B-4 PROPOSED BORING LOCATION <br /> ND <br /> \ r <br /> Date 12/22/03 Project No. 2597.10 Figure 1 <br /> v, Reference: Basemap from Siegfried Engineering,Inc.,1999. T10 <br />