My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MADISON
>
423
>
3500 - Local Oversight Program
>
PR0544427
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 5:02:38 PM
Creation date
5/6/2019 4:51:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0544427
PE
3528
FACILITY_ID
FA0004581
FACILITY_NAME
CHASE CHEVROLET*
STREET_NUMBER
423
Direction
N
STREET_NAME
MADISON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
423 N MADISON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
activities. The excavation was terminated once groundwater was encountered as confirmation <br /> sample BOT-13 met RAOs.. <br /> 5.2.1 Area 10 RAP Excavations <br /> As shown on Figure 3, Area 10 contained 23 RAP excavations at the locations. Table 1 <br /> identifies the COCs associated with each RAP excavation. Ten RAP excavations in this area had <br /> confirmation samples that met the RAOs after the excavation proposed in the RDIP was <br /> completed. Thirteen RAP excavations in this area had sidewall and/or floor samples that did not <br /> meet the RAOs after the initial excavation, and additional excavation and confirmation sampling <br /> was conducted until the RAOs were met. Figures 7, 8 and 9 show the RAP excavation <br /> dimensions and confirmation sampling locations for Area 10. Confirmation sampling locations <br /> shown in gray on the figures indicate that these locations were removed during subsequent <br /> excavation. Table 3 presents the confirmation sample analytical results for Area 10. The <br /> estimated soil volume for RAP excavations in Area 10 presented in the RDIP was 144 cy yards, <br /> and the volume estimated based on.excavation dimensions after completion was 311 cy <br /> j (Table 10). <br /> f <br /> 5.2.2 Area 11 RAP Excavations <br /> Area 11 contained four RAP excavations at the locations shown on Figure 4. Table 1 identifies <br /> the COCs associated with each RAP excavation. Only one RAP excavation in this area (11137) <br /> - had a confirmation sample that did not meet the RAOs after the excavation proposed in the RDIP <br /> i was completed. Figure 10 shows the RAP excavation dimensions and confirmation sampling <br /> locations for Area 11. Confirmation sampling locations shown in gray on the 11137 figure <br /> indicate that these locations were removed during subsequent excavation. Table 4 presents the <br /> confirmation sample analytical results for Area 11. The estimated minimum soil volume for <br /> RAP excavations in Area 11 presented in the RDIP was 24 cy, and the volume estimated based <br /> on excavation dimensions after completion was 31 cy(Table 10) <br /> f <br /> i <br /> 25971025.DGD 13 11 August 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.