Laserfiche WebLink
Y i <br /> 1 • 30 July 1999 <br /> AGE-NC Project No 95-0144 <br /> Page 4 of 4 <br /> 5.0. RECOMMENDATIONS <br /> ' Based upon data obtained during the second quarter of 1999 and previous sampling events, AGE <br /> recommends the following <br /> ' The next quarterly monitoring event should be scheduled for August 1999, concurrent with <br /> monitoring at the Van Buren site In accordance with the revised monitoring schedule, <br /> monitoring wells MW-1, MW-2, MW-4, MW-13, MW-19A & B, MW-20A & B and MW- <br /> ' 21 A & B will be sampled at that time The depth to ground water will be measured in all <br /> monitoring wells for gradient and flow direction determination <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site have been made from a limited number of available data points (i a ground <br /> water monitoring wells), and subsurface conditions may vary through time and with distance from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br /> recommendations contained in this report <br /> ' Advanced GeoEnvironmental,Inc <br /> r <br /> 1 <br />