Laserfiche WebLink
' 22 March 1999 <br /> . AGE-NC Project No 95-0144 <br /> Page 5 of 5 <br /> 5.0. RECOMMENDATIONS <br /> ' Bas the first quarter of 1999 and previous <br /> Based upon data obtained during the fourth quarter of 1998, q <br /> ' sampling events, AGE recommends the following <br /> • In accordance with an April 1998 meeting with the PHS-EHD, laboratory analysis by EPA <br /> Method 8260 of samples collected from MW-1 through MW-18 will be discontinued <br /> Analysis of samples by EPA Method will continue for samples collected from MW-19,MW- <br /> 20 and MW-21 <br /> ' • The next quarterly monitoring event should be scheduled for May 1999, concurrent with <br /> monitoring at the Van Buren site In accordance with the revised monitoring schedule, <br /> ' monitoring wells MW-1, MW-2, MW-4, MW-13, MW-19A& B, MW-20A & B and MW- <br /> 21A & B will be sampled at that time The depth to ground water will be measured in all <br /> monitoring wells for gradient and flow direction determination <br /> '. 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinanly exercised by <br /> ' environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site have been made from a limited number of available data points (i a ground <br /> water monitoring wells), and subsurface conditions may vary through time and with distance from <br /> these data points No other warranty, expressed or implied, Is made as to the professional <br /> recommendations contained in this report <br /> 1 <br /> ' Advanced GeoEniironmental,Inc <br /> 1 <br />