Laserfiche WebLink
1 <br /> 08 December 1998 <br /> ��. AGE-NC Project No 95-0144 <br /> ' Page 7 of 7 <br /> ' The next quarterly monitoring event should be scheduled for November 1998, concurrent <br /> with monitoring at the Van Buren site In accordance with the revised monitoring schedule, <br /> monitoring wells MW-1, MW-2, MW-4, MW-13, MW-19A & B, MW-20A & B and MW- <br /> 21A & B will be sampled at that time The depth to ground water will be measured in all <br /> monitoring wells for gradient and flow direction determination <br /> 1 <br /> 6.0. LIMITATIONS <br /> ' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site have been made from a limited number of available data points (i e ground <br /> water monitoring wells), and subsurface conditions may vary through time and with distance from <br /> ' these data points No other warranty, expressed or implied, is made as to the professional <br /> recommendations contained in this report <br /> a <br /> r <br /> 1 , <br /> r ' <br /> Adranced GcoEm pronmcntal,Inc <br /> I <br />