Laserfiche WebLink
I ' <br /> l I <br /> I, . 03 October 2000 <br /> AGE-NC Project No 95-0144 <br /> Page 5 of 5 <br /> • Implementation of the work plan submitted to the PHS-EHD for remediation at the former <br /> UST No 1 location and for feasibility testing at the former UST No 8 location upon <br /> regulatory agency approval <br /> • Preparation of a work plan for the advancement of additional soil probe borings to further <br /> assess the extent of contanimants in the area of borings 15B-6 and 15B-9 <br /> 6.0. LEMTAT)IONS <br /> ' Ourp rofessional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly' <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site have been made from a limited number of available data points (i a ground <br /> water monitoring wells), and subsurface conditions may vary through time and with distance from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br /> recormendations contained in this report <br /> N I <br /> 1 <br /> 1 <br /> I <br /> ' Advanced GeoEnvuonmentai,Inc <br />