Laserfiche WebLink
1 <br /> i <br /> { <br /> I a <br /> 21 April 2000 <br /> AGE-NC Project No 95-0144 <br /> ' Page 5 of 5 <br /> 5.0 RECOMMENDATIONS <br /> Based upon data obtained during the first quarter of 2000 and previous sampling events, AGE <br /> recommends the following <br /> The next quarterly monitoring event should be scheduled for May 2000, concurrent with <br /> ' monitoring at the Van Buren site In accordance with the revised monitoring schedule, <br /> monitoring wells MW-1,MW-2, MW-4, MW-13, MW-19A&B, MW-20A &B and MW- <br /> 21A & B will be sampled at that ttme <br /> ' A work plan has been prepared and submitted to the PHS-EHD for remediation at the former <br /> UST No 1 location and for feasibility testing at the former UST No 8 location Upon <br /> ' regulatory agency approval, the outlined work should be performed <br /> I <br /> 6.0. LIMITATIONS , <br /> . Our professional services were perfonned using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site have been made from a limited number of available data points (a e ground <br /> water monitoring wells), and subsurface conditions may vary through time and with distance from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br /> ' recommendations contained in this report <br /> l <br /> I <br /> 1 I <br /> • I <br /> Adtanced GeoEmironmcntal,Inc <br /> I 4 <br />