My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0004801
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MADISON
>
423
>
3500 - Local Oversight Program
>
PR0544427
>
ARCHIVED REPORTS XR0004801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 9:27:40 AM
Creation date
5/7/2019 9:13:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004801
RECORD_ID
PR0544427
PE
3528
FACILITY_ID
FA0004581
FACILITY_NAME
CHASE CHEVROLET*
STREET_NUMBER
423
Direction
N
STREET_NAME
MADISON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
423 N MADISON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> y 1 <br /> 04 March 1996 <br /> AGE-NC Project No 95-0144 <br /> Page 4 of 18 <br /> r - <br /> 4.0. IN-SITU AIR SPARGING PILOT TEST <br /> ' 41 PROCEDURES <br /> 4 1,1 SYSTEM INSTALLATION AND SETUP <br /> From 02 February to 07 February 1996, an in-sau air sparging (IAS) pilot test was performed at the <br /> r site This pilot test was performed to provide data for the feasibility of air sparging as a remediation <br /> ' method at the site Two sparging wells were installed at the site on 25 January 199C(Section 3 0) <br /> PVC piping was installed from a temporary'air compressor to the two wells On 02 February 1996, <br /> compressed air was supplied to the two IAS wells at a pressure of approximately 15 pounds per <br /> square inch(psi) The pressure was increased from 05 February to 07 February to approximately 20 <br /> sparging Approximately 5 to 7 psi was required to overcome the water column in the spargg wells t <br /> , <br /> ' For the IAS pilot test, wells MW-1, MVV-2,MW-4, MW-5 and MW-18 were utilized for observation <br /> points ,Each well was fitted with air-tight well caps, valves and tubing for monitoring <br /> pressure/vacuum and organic vapors in each well <br /> r <br /> ' 4 1 2 COLLECTION OF BASELINE GROUND WATER SAMPLES <br /> ,On 30 January 1996, ground water samples were collected from monitoring wells MW-1, MW-4 and <br /> ' MW-5, following the procedures outlined in Section 5 0 Samples were transported under chain-of- <br /> custody to MAI and analyzed for TPH-g and BTE&X in accordance with EPA methods 5030 and <br /> 602 and to Alpha Analytical Laboratories (AAL) in Ukiah, California and analyzed for dissolved iron <br /> in accordance with EPA method 236 1 Samples were collected to piovide baseline concentrations <br /> immediately before the IAS test <br /> ' Upon completion of the IAS test, ground water samples were collected from each well at the site as <br /> a part of the standard quarterly ground water monitoring (see Section 5 0 ) ' <br /> 4 1'3 FIELD MEASUREMENTS AND DATA COLLECTION <br /> Induced pressure, organic vapors, ground water depth and dissolved oxygen were measured at MW- <br /> ' 1, MW-2, MW-4 and MW-5 throughout the test Measurements were also collected at M-XV-18 <br /> during the startup and middle of the test Induced pressure was measured at each well using <br /> ' Magnelielic differential pressure gauges, organic vapor`s were measured at each well head using a <br /> r photo-ionization detector(PID), ground water depth was measured using a Sohnst water'level meter, <br /> and dissolved oxygen was then measured using a YS1 Model 55 dissolved oxygen meter Afler <br /> collection of measurements, the air-tight well cap was replaced at the end of each monitoring pet iod <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.