Laserfiche WebLink
J.Ah1-31-21013 59:33 Sere ice Station Systems 488 938 8885 P.05 <br /> 5. SECONDARY PIPE TESTING <br /> 'rest Method Developed By: ❑ Piping Manufacturer 0 Industry standard ❑ Professional Engineer j <br /> ❑ Other(Specify) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution: 0.5% of span <br /> Piping Ran#87 Piping Run#91 <br /> Piping Material: Poly Poly <br /> Piping Manufacturer: Blue Plastic Blue.Plastic <br /> Piping Diameter: 2" ?' <br /> Length of Piping Run: 100' 100' ! <br /> Product Stored: Czasoline Gasoline <br /> Method and location of <br /> Reducer BootslTittings Reducer BrwtJFittings <br /> piping-run isolation: <br /> wait time between applying <br /> pressure/vacuum/water And 10 minutes 10 minutes <br /> starting test: <br /> Test Start Time: 9:15 am 9:15 am <br /> Initial Reading(Ri): 5 psi 5 psi <br /> Test End Time: 10:15 am 10:15 am <br /> Final Reading(RF): 5 psi 5 psi <br /> Test Duration: I hr. 1 hr. <br /> Change in Reading(RF-Rt): None None <br /> Pass/ ail Threshold or <br /> Criteria: No detectable Loss No detectable Loss <br /> Test Result: j 0 Pass Fail o bass Fail <br /> Comments— (include information.on repairs made prior to testing, and recommended follow-tip for failed tests) <br />