Laserfiche WebLink
SWRCB. January 2002 <br /> Page 3 of 7 <br /> Job: Gas 4 Less <br /> 3434 Manthey Road <br /> Stockton,CA 95206 <br /> Date: March 4,2010 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: [X]Piping Manufacturer [ ] Industry Standard [ ]Professional <br /> Engineer <br /> [ ] Other(Spec) <br /> Test Method Used: [X]Pressure [ ] Vacuum [ ] Hydrostatic <br /> [ ] Other(Spec) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0.20 <br /> Piping Run Piping Run Piping Run Piping Run Piping Run <br /> Regular Super <br /> Piping Material: Poly Poly <br /> Piping Manufacturer: OPW-Pisces OPW-Pisces <br /> Piping Diameter: 1.5 1.5 <br /> Length of Piping Run: 200 200 <br /> Product Stored: Regular Su er <br /> Method and location of Test Test <br /> piping-run isolation: Boot Boot <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 8:30 am 9:00 am <br /> Initial Reading(RI) 3 .s.i. 3 .s.i. <br /> Test End Time: 9:30 am 10:00 am <br /> Final Reading(Rf): 3 .s.i. 3 .s.i. <br /> Test Duration: 1 Hour 1 Hour <br /> Chane in Reading(Rf-Rl) -0- -0- <br /> Pass/Fail Threshold or -0- -0- <br /> Criteria: <br /> Test Result: IX]Pass[ ] Fail [X] Pass [ ]Fail [ ] Pass [ ] Fail []Pass[]Fail [ ]Pass [ ]Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> Found test boots missing& broken. Replaced test boot and re-tested. <br />