Laserfiche WebLink
SWRCB,January 2002 Page 2) of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑ Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Sped) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution:0-15 PSI <br /> Piping Run#l Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Poly Poly <br /> Piping Manufacturer: OPW/Environ OPW/Environ <br /> Piping Diameter: 1.5 1.5 <br /> Length of Piping Run: 220 220 <br /> Product Stored: Regular Premium <br /> Method and location of Test boot Test boot Test boot Test boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-Ri): <br /> Pass/Fail Threshold or 0 drop 0 drop 0 drop 0 drop <br /> Criteria: <br /> Test Result: ❑ Pass x Fail ❑ Pass x Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Unable to seal test boot in UDC 9-\10 line will build no pressure <br />