My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
3408
>
2300 - Underground Storage Tank Program
>
PR0517521
>
COMPLIANCE INFO 2010 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 3:39:19 PM
Creation date
5/7/2019 10:21:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2018
RECORD_ID
PR0517521
PE
2361
FACILITY_ID
FA0013484
FACILITY_NAME
FOOD 4 LESS FUEL CENTER*
STREET_NUMBER
3408
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16422011
CURRENT_STATUS
01
SITE_LOCATION
3408 MANTHEY RD
P_LOCATION
01
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M' <br /> SWRCB.January 2002 <br /> Page 3 of 7 <br /> Job: Cas 4 Less <br /> 3434 Manthey Road <br /> Stockton,CA 95206 <br /> Date: February 23,2010 <br /> _ 5. SECONAARV PIPE TESTING _ <br /> 'fest Method Developed By: [X] Piping Manufacturer Tndustty Standard [ J Professional <br /> Engineer <br /> [ Other(Specify) <br /> `lest Method Used: [X] Pressure ( ] Vacuum [ ] Hydrostatic <br /> ( ] Other(Specifv) <br /> Test F utnent Used: Pressure Gauge Equipment Rosolution: 0.20 <br /> Piping Run Piping Run Piping,Run Piping Run Piping Run <br /> Regular Super <br /> Piping Material: Poly Poly <br /> Pi ing Manufacturer: OPW-Pisces OPW-Pisces <br /> —Piping Diameter: 1.5 .1.5 _ <br /> Len th of I'i ing Run: 200 200 <br /> _Product Stored: Regular Sneer <br /> Method and location of Test Fest <br /> iping-run isolation: Soot Boot <br /> Wait time between applying <br /> pressure/vaCUum/Water and <br /> starting test: <br /> Test Start Time: 8:30 am 9:00 am <br /> Initial Reading(B!) 3 .s.i. 3 .s.i. <br /> Test End Time: 9:30 am 10:00 am <br /> Final Reading(RQ! 3 .s.i. 3 .s.i. - <br /> Test Duration: 1 flour l Hour <br /> Change in Reading(Rf-R1) -0- -0- <br /> Pass/Fail Threshold or -0- -0- <br /> Criteria: <br /> TTest Result: I JXI Pala[ ]Fail [XJ Paes I [Fail ( ] Pass [ 1 Phil []PnssJ J Fail ( I Pass [ ].Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> Found test boots missing& broken. Replaced test boot and re-tested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.