Laserfiche WebLink
Facility/Site <br /> FOOD 4 LESS FUEL CENTER* LIST Tank ERS ID <br /> 408 MANTHEY RD TA 0515605 10184365 <br /> TOCKTON,CA 95206 Tank Info:Installed Date:5/10/2002 12:00:00 AM-Tank Use:Motor Vehicle Fueling-Tank <br /> Contents:Premium Unleaded-Type Of Tank:Double Wall-Piping Construction:Double- <br /> walled <br /> Pipe Monitoring is Performed Using the Following Method(s) <br /> Yes Continuous Monitoring of Piping Secondary Containment <br /> Piping Secondary Containment Panel Manufacturer Leak Sensor Manufacturer <br /> Dry Veeder-Root Veeder-Root <br /> Panel Model# Leak Sensor Model# <br /> TLS-350 PLUS 208 <br /> es Leak Alarm Triggers Automatic Pump Shutdown <br /> Yes Failure/Disconnect Triggers Pump Shutdown Hr-kaElVED <br /> Mechanical Line Leak Detector Performs 3 GPH Leak Test )A N 11 2018 <br /> MLLD Manufacturer MLLD Model <br /> Yes Electronic Line Leak Detector Performs 3 GPH Leak Test E I�`� <br /> IRONMENTAL HEN <br /> DEPARTMENT <br /> ELLD Manufacturer ELLD Programmed In-Line Testing ELLD Triggers Automatic Pump Shutdown <br /> eeder-Root Yes <br /> LLD Model ELLD Failure/Disconnect Triggers Automatic Shutdown <br /> PLLD Yes <br /> Pipeline Integrity Testing Visual Pipeline Monitoring <br /> Pipeline Integrity Testing Frequency Visual Pipeline Monitoring Frequency <br /> Suction Piping Meets Exemption Criteria <br /> No Regulated Piping Per Health and Safety Code,Division 20,Chapter 6.7 Is Connected To The Tank System <br /> Other Pipeline Monitoring <br /> Under Dispenser Containment(UDC)Monitoring <br /> 'DC Monitoring Detection of Leak into UDC Triggers Audible and Visual Alarms <br /> Continuous Yes <br /> UDC Leak Alarm Triggers Automatic Pump Shutdown <br /> DC Panel Manufacturer Yes <br /> eeder-Poot Failure/Disconnection of UDC Monitoring System Triggers Automatic Pump Shutdown <br /> DC Panel Model# Yes <br /> LS-350 PLUS UDC Monitoring Stops Flow of Product at Dispenser <br /> DC Leak Sensor Manufacturer <br /> eeder-Root UDC Construction <br /> DC Leak Sensor Model Single-walled <br /> 08 UDC Secondary Containment Monitoring <br /> Leak Within Secondary Containment of UDC Causes Audible and Visual Alarms <br /> Periodic System Testing <br /> ELD Testing <br /> �es Secondary Containment Testing <br /> es Spill Bucket Testing <br /> Printed on 1/9/2018 9:47 AM <br />