Laserfiche WebLink
REGFNED <br /> Monitoring System Certification <br /> DEC 14 2017 <br /> UST Monitoring Site Plan <br /> ?yo,? ENVIRONMENTAL HEALTH <br /> I <br /> Site Address: 3434 Manthey Road, Stockton OEPARTNARNIT i <br /> I <br /> ] . . . . . . . . . . . . . . . . . . . . . . . . . . E <br /> Pipe Runs are estimated 87& 91 are Split Tank & Share <br /> 2. <br /> 208 . . . . . . Annular Space.(VR 794390-460) <br /> •3 ' ALL Sumps& UDC's have(VR ! <br /> . . . . . . . . . . . . . . . . . . . . . . . . 20.8 . . _ . . . . 794380-208)Sensors i <br /> . . . . . . I, <br /> . . . . . . . . . . . . . . . . . . . . 4 . . . . . 91 &87 Turbine Sumps Contain <br /> • • • • • . . . • • • • • . . • . . • • • 5 • • • • • • • TLM Probes VR 846390-111 & <br /> ' ' ' ' ' . ' ' ' ' ' ' ' ' • ' ' . • • • . VR 8484 Line Leak Detectors <br /> 208 <br /> . . . . . . . . . . . . . . . . . . . . . 6 . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . <br /> . . . . . . . .KIOSK . . . VeederRdof ESO. . . . . . . . . . . . . . . . ' . <br /> . . I . . . . . .TLS 350 • . <br /> . . . . . . . . . . . . . . . . <br /> ESO <br /> . . . . . . . . . . . . . . . . . . . . . . 7. <br /> .209 . <br /> . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . I . . . $ . . . . . . . . . . . . . . . . . . <br /> . . . . . . . <br /> 9. . . . . . I . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . 20S ' . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . I . . . . . . . . . .10 . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . 9Y STP . . . . . . . . 87191•Annular . . . . . . . . . . . . . . <br /> TG <br /> . . . . . . '208 AVR 8208 <br /> 4' 208' ( VR 8484 <br /> O. L11) 440. 'LLD . . . . . . . <br /> . . . . . . . . . . . . . . . . . . <br /> . . . . ' 91 Fill . . . . . 87 Fill. . . '87 STP <br /> . . . . . . . . . . . . . . . . . . . . . . <br /> Date map was drawn: 1214117 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your <br /> Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify F <br /> locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br /> spaces, sumps, dispenser pans, spill containers,or other secondary containment areas; mechanical or electronic line leak <br /> detectors;and in-tank liquid level probes(if used for leak detection). In the space provided,note the date this Site Plan <br /> was prepared. Page of 05/00 <br /> pRos1�S� I 4 <br /> I <br />