Laserfiche WebLink
One thing that was not in the report, but I wanted to make note of,the SPCC Plan was amended on 3/18/2019 to <br /> include the following changes: "removed reference to 55-gallon storage at Shop parts area". The box for PE certification <br /> was marked "no". This amendment is a technical change, requiring a PE certification within six months of <br /> amendment. A technical amendment is a change to the facility,tanks, procedures, materials, construction, design, or <br /> maintenance that materially increases or decreases the facility's potential for oil discharge. <br /> Please review the inspection report and if anything is unclear please let me know. <br /> Best Regards, <br /> Lydia Baker <br /> Registered Environmental Health Specialist <br /> San Joaquin County <br /> Environmental Health Department <br /> 209-468-8257 <br /> (baker@sigov.org <br /> Please note my email address has changed to(baker@sigov.org <br /> 4 <br />