My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2800 - Aboveground Petroleum Storage Program
>
PR0516151
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 9:13:36 AM
Creation date
5/7/2019 10:35:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516151
PE
2832
FACILITY_ID
FA0005245
FACILITY_NAME
Granite Construction Company-French Camp Facility
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
Rd
City
French Camp
Zip
95231
APN
193-270-03
CURRENT_STATUS
01
SITE_LOCATION
10500 S Harlan Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thank you, <br /> Courtney DePorto <br /> Environmental Coordinator II <br /> Valley Region <br /> 4001 Bradshaw Road <br /> Sacramento,CA 95827 <br /> Direct:916-855-4514 <br /> Cell: 916-825-5708 <br /> Email: courtney.deporto@gcinc.com <br /> www.qraniteconstruction.com <br /> GFUMITE <br /> 0 0RID'SM ST'y <br /> ' ETHICAL <br /> em <br /> COMPANIES' <br /> W7115PHER E,COM <br /> From: Baker, Lydia [mailto:lbaker@sigov.org] <br /> Sent: Friday, May 31, 2019 3:38 PM <br /> To: Deporto, Courtney<Courtney.Deporto@gcinc.com> <br /> Subject: RE: Inspection Report <br /> Hello Courtney, <br /> I reviewed the Return to Compliance statement and documents. I have closed out two of the violations so far. Here is <br /> what I need to close out the remaining violations: <br /> #105-For AST#3, 112.2 states: <br /> Permanently closed means any container or facility for which: <br /> (1)All liquid and sludge has been removed from each container and connecting line;and <br /> (2)All connecting lines and piping have been disconnected from the container and blanked off,all valves(except for ventilation valves)have been <br /> closed and locked,and conspicuous signs have been posted on each container stating that it is a permanently closed container and noting the date <br /> of closure. <br /> Piping does need to be disconnected in order to make a claim of permanently closed. I did review the file and narrative <br /> written for the site and there is nothing stating that an exception was made for this tank. On 8/19/2013 an Official <br /> Inspection Report was issued with corrective actions stating the above. If you would like a copy I can send that to you. <br /> 301- 1 can close it once I verify the changes in the SPCC plan <br /> 618- 1 still need copies of the annual and area c inspections. They were not provided during the inspection and I did not <br /> see them on the emails to Cesar. For the external inspections I will amend the report to remove that section since you <br /> did provide those to Cesar prior to the inspection. I will wait to amend the report once a decision is made about the <br /> cutback oil. If the cutback oil is not a liquid at 60 degrees Fahrenheit then I will remove that from the report as well. If it <br /> is liquid then that tank will need an external inspection if you haven't done that. <br /> 712-Copy of the SPCC plan to verify changes <br /> 717-Waiting for the information from the manufacturer <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.