Laserfiche WebLink
for subsequent feasibility studies. <br /> Additionally, groundwater samples should be collected from MW-1, 2, and 3, and any <br /> subsequently established monitor wells, to allow continued assessment of potential groundwater <br /> gradient and/or chemical concentration fluctuations. <br /> t <br /> f <br />