My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
2900 - Site Mitigation Program
>
PR0505363
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 4:30:32 PM
Creation date
5/7/2019 3:59:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505363
PE
2960
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
01
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
AMeuangkhoth
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A(Figures): <br /> ' 1: Site Location Map <br /> 2: Site Plan with SVE Layout <br /> 3: Groundwater Gradient Map (March 2015) <br /> ' 4: TPHg Isoconcentration Map (March 2015) <br /> 5: TPHd Isoconcentration Map (March 2015) <br /> 6: Benzene Isoconcentration Map (March 2015) <br /> 7: MTBE Isoconcentration Map (March 2015) <br /> 8: Groundwater Gradient Map (June 2015) <br /> ' 9: TPHg Isoconcentration Map (June 2015) <br /> 10: TPHd Isoconcentration Map (June 2015) <br /> 11: Benzene Isoconcentration Map (June 2015) <br /> ' 12: MTBE Isoconcentration Map (June 2015) <br /> 13: Groundwater Gradient Map (September 2015) <br /> 14: TPHg Isoconcentration Map (September 2015) <br /> ' 15: Benzene Isoconcentration Map (September 2015) <br /> 16: MTBE Isoconcentration Map (September 2015) <br /> 17: Groundwater Gradient Map (December 2015) <br /> ' 18: TPHg Isoconcentration Map (December 2015) <br /> 19: Benzene Isoconcentration Map (December 2015) <br /> 20: MTBE Isoconcentration Map (December 2015) <br /> Attachment B (Tables): <br /> 1: Monitoring Well Construction Details <br /> ' 2: Cumulative Groundwater Elevation Data <br /> 3: Free Product Removal from Monitoring Well MW6R <br /> 4: Free Product Removal from Monitoring Well MW8 <br /> 5: Free Product Removal from Monitoring Well MW9R <br /> 6: Free Product Removal from Vapor Extraction Well VEW 1-D <br /> 7: SVE System Monitoring and Mass Removal Data <br /> ' 8: Cumulative Soil Vapor Analytical Results <br /> 9: First Quarter 2015 Groundwater Monitoring and Analytical Data <br /> 10: Second Quarter 2015 Groundwater Monitoring and Analytical Data <br /> ' 11: Third Quarter 2015 Groundwater Monitoring and Analytical Data <br /> 12: Fourth Quarter 2015 Groundwater Monitoring and Analytical Data <br /> 13: Cumulative Groundwater Analytical Results <br /> ' 14: Cumulative Groundwater Analytical Results—Oxygenates <br /> Attachment C (Graphs) <br /> ' cc: Mr. Pat Riddle, Law Offices of Patrick D. Riddle <br /> Mr. Nathan Crum, Valley Pacific Petroleum Services, Inc. <br /> ' Mr. Johnny Yoakum, San Joaquin County Environmental Health Department <br />
The URL can be used to link to this page
Your browser does not support the video tag.