My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
2900 - Site Mitigation Program
>
PR0505363
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 4:30:32 PM
Creation date
5/7/2019 3:59:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505363
PE
2960
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
01
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
AMeuangkhoth
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Joel Weiss <br />June 22, 1994 <br />Page two <br />until turbidity is minimized. The well will be purged 48 hours <br />later. A minimum of three well volumes (casing and <br />sandpack) will be removed using pH, temperature and electrical <br />conductivity stabilization as parameters for estimating sample <br />representativeness. A water sample will be submitted for BTEX and <br />Total Gasoline, Diesel and Kerosene hydrocarbons analysis. Prior <br />to sampling water levels will be obtained from all site wells <br />and the new well will be tied into the existing well survey. <br />Laboratory services will be provided by Sequoia Analytical (DOHS <br />Cert. #1210). <br />Bailing of free product from well MW -8 has been initiated and will <br />continue. Product thickness, depths to water and amounts recovered <br />are being logged weekly. <br />A technical summary report will be prepared which will include all <br />analytical results, a groundwater gradient plot, free product <br />recovery data and recommendations for additional work at the site. <br />It is anticipated that no further characterization activities will <br />be necessary prior to preparing a corrective action plan. <br />All field and laboratory activities performed at the site will be <br />conducted in accordance with the attached Quality Assurance/Quality <br />Control Plan. <br />We are prepared to begin work within 30 days of your authorization <br />to proceed. The technical summary report will be provided within <br />60 days of your authorization. If you have any questions or <br />comments regarding this proposed work please contact me at your <br />convenience. <br />tfully, <br />lelW. <br />Juncal <br />CA Registered Geologist no. 3864 <br />cc: San Joaquin County EHD <br />P. Riddle <br />enc. <br />RWJ/lkk <br />
The URL can be used to link to this page
Your browser does not support the video tag.