My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
2900 - Site Mitigation Program
>
PR0505363
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 4:30:32 PM
Creation date
5/7/2019 3:59:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505363
PE
2960
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
01
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
AMeuangkhoth
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quality Assurance/Quality Control Plan Page 7 <br />An acrylic Surface Sampler will be used for visual inspection of the groundwater in order to note <br />sheens (difficult to detect with the Interface Probe), odors, microbial action and sediments. The <br />sampler is calibrated in inches and centimeters for visual inspection of product thickness. <br />To reduce the potential for cross contamination between wells, the monitorings will take place <br />in order from the least to most contaminated, if known. Well containing free product will be <br />monitored last. Between each well monitoring the equipment will be decontaminated <br />Water level data collected from the wells will be used to develop a groundwater contour map <br />for the project site. Groundwater flow will be estimated to be perpendicular to equipotential <br />lines drawn on the map. <br />10.0 WELL DEVELOPMENT PROTOCOL <br />Groundwater monitoring wells will be surged and developed prior to setting the surface seal. <br />Approximately 10 times the volume of water in the casing will be withdrawn if possible. Casing <br />volumes will be calculated in the following manner: <br />VOLUME OF SCHEDULE 40 PVC PIPE <br />DIAMETERI.D. 44 VOLUME <br />(inches) (inches) Gal/linear ft. <br />2 1 2.067 1 0.17 <br />4 1 4.026 1 0.66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.