Laserfiche WebLink
Joel Weiss <br />Page two <br />Upon completion the well will be developed by surging and pumping <br />until turbidity is minimized. The well will be purged the <br />following day of a minimum of three well volumes (casing and <br />sandpack) using pH, temperature and electrical conductivity <br />stabilization as parameters for estimating sample <br />representativeness. A water sample will be submitted for BTEX and <br />Total Gasoline, Diesel and Kerosene hydrocarbons analysis. Prior <br />to sampling water levels will be obtained from all site wells <br />and the new well will be tied into the existing well survey. <br />'3ailing of free product from <br />ontinue. Product thickness, <br />are being logged weekly. <br />We are prepared to begin work <br />to proceed. If you have any <br />proposed work please contact <br />Res tfully, <br />Ru sell W. Juncal <br />well MW -8 has been initiated and will <br />depths to water and amounts recovered <br />within 30 days of your authorization <br />questions or comments regarding this <br />me at your convenience. <br />CA Registered Geologist no. 3864 <br />cc: San Joaquin County EHD <br />P. Riddle <br />enc. <br />RWJ/lkk <br />