Laserfiche WebLink
STATE OF CALIFORNIA nvironmental Protection cy <br />CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br />CENTRAL VALLEY REGION <br />3443 Routier Road, Suite A <br />Sacramento, CA 95827-3098 <br />PHONE: (916) 255-3000 <br />FAX: (916) 255-3015 <br />11 October 1995 <br />Mr. Norman Crum <br />Woolsey Oil Company <br />166 Frank West Circle <br />Stockton CA 95246 <br />PETE WLSON, Governor <br />REVISED BORING/MONITORING WELL LOCATIONS AND PROPOSED SCHEDULE OF <br />ACTIVITIES, WOOLSEY OIL COMPANY, LODI, SAN JOAQUIN COUNTY <br />I have reviewed the above -referenced letter prepared by your consultant, Ground Zero Inc.. Also, <br />I have had telephone conversations with Mr. Justin Power and Mr. Kerry Zimmerman on <br />11 October 1995 reviewing this proposal and discussing my comments. We agreed to the following: <br />That three additional monitoring wells would be installed, one up gradient, one down gradient, <br />and one cross gradient. This is one less monitoring well than proposed and agreed to in your <br />3 July 1995 report. <br />2. That offsite access agreements for monitoring wells would be in place by 11 November 1995 <br />and that I would be copied on all correspondence with the adjacent property owners. Offsite <br />monitoring wells were proposed in your 3 July 1995 report. In my conversation with <br />Mr. Zimmerman he said that there have only been telephone conversations to date with the <br />adjacent property owners. The proposed schedule suggested that offsite access approval may be <br />obtained by 21 December 1995. That would be almost six months to obtain the offsite access <br />agreements, ��,hich is Far to lnnan fpr basic access agreements. According to the schedule, with <br />the offsite access agreement in place by 21 November 1995, field work will begin by <br />21 November 1995 and a report of findings due by 21 December 1995. <br />3. That a survey of domestic ground water wells around the site would be conducted and a copy <br />submitted to the Board. <br />4. That after the additional monitoring wells are installed a report of findings would include a <br />summary of all sampling events and a summary of bailed free product. <br />5. That in addition to a product skimmer in well MW -8 a work plan and schedule for interim <br />remediation would be submitted by 21 December 1995. <br />