My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
2900 - Site Mitigation Program
>
PR0505363
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 4:30:32 PM
Creation date
5/7/2019 3:59:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505363
PE
2960
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
01
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
AMeuangkhoth
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA nvironmental Protection cy <br />CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br />CENTRAL VALLEY REGION <br />3443 Routier Road, Suite A <br />Sacramento, CA 95827-3098 <br />PHONE: (916) 255-3000 <br />FAX: (916) 255-3015 <br />11 October 1995 <br />Mr. Norman Crum <br />Woolsey Oil Company <br />166 Frank West Circle <br />Stockton CA 95246 <br />PETE WLSON, Governor <br />REVISED BORING/MONITORING WELL LOCATIONS AND PROPOSED SCHEDULE OF <br />ACTIVITIES, WOOLSEY OIL COMPANY, LODI, SAN JOAQUIN COUNTY <br />I have reviewed the above -referenced letter prepared by your consultant, Ground Zero Inc.. Also, <br />I have had telephone conversations with Mr. Justin Power and Mr. Kerry Zimmerman on <br />11 October 1995 reviewing this proposal and discussing my comments. We agreed to the following: <br />That three additional monitoring wells would be installed, one up gradient, one down gradient, <br />and one cross gradient. This is one less monitoring well than proposed and agreed to in your <br />3 July 1995 report. <br />2. That offsite access agreements for monitoring wells would be in place by 11 November 1995 <br />and that I would be copied on all correspondence with the adjacent property owners. Offsite <br />monitoring wells were proposed in your 3 July 1995 report. In my conversation with <br />Mr. Zimmerman he said that there have only been telephone conversations to date with the <br />adjacent property owners. The proposed schedule suggested that offsite access approval may be <br />obtained by 21 December 1995. That would be almost six months to obtain the offsite access <br />agreements, ��,hich is Far to lnnan fpr basic access agreements. According to the schedule, with <br />the offsite access agreement in place by 21 November 1995, field work will begin by <br />21 November 1995 and a report of findings due by 21 December 1995. <br />3. That a survey of domestic ground water wells around the site would be conducted and a copy <br />submitted to the Board. <br />4. That after the additional monitoring wells are installed a report of findings would include a <br />summary of all sampling events and a summary of bailed free product. <br />5. That in addition to a product skimmer in well MW -8 a work plan and schedule for interim <br />remediation would be submitted by 21 December 1995. <br />
The URL can be used to link to this page
Your browser does not support the video tag.