My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2900 - Site Mitigation Program
>
PR0503634
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 4:40:56 PM
Creation date
5/7/2019 4:15:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0503634
PE
2950
FACILITY_ID
FA0005914
FACILITY_NAME
VICTOR ROAD SHELL
STREET_NUMBER
880
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905032
CURRENT_STATUS
02
SITE_LOCATION
880 VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTHbEPARTMENT <br /> 'OPQUIry.CQ <br /> Donna K.Heran,R.E.H.S. SAN JOAQUIN COUNTYUnit Supervisors <br /> Director 304 East Weber Avenue, Third Floor Carl Bergman,R.E.H.S. <br /> AI Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> • rq�iFQ RNV' • Program Manager Telephone: 468-3420 Douglas W.Wilson,R.E.H.S. <br /> 209 <br /> Laurie A.Cotulla,R.E.H.S. p ( ) Margaret Lagorio,R.E.H.S. <br /> Program Manager Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> DENIS L BROWN JUN .2 4 M5 <br /> SHELL OIL PRODUCTS <br /> 20945 S WILMINGTON <br /> CARSON CA 90810-1039 <br /> RE: SHELL Sites in San Joaquin County <br /> A meeting was held on June 9,2005,at the office of San Joaquin County Environmental Health <br /> Department (EHD). Attending the meeting were you representing Shell Oil,Joe Neely and Aubrey <br /> Cool representing Cambria Environmental Technology, Inc.,and Margaret Lagorio,Nuel C. <br /> Henderson,Jeff Wong,Harlin Knoll,Michael Infuma,Lori Duncan,and Vicki McCartney <br /> representing EHD. There was a general discussion about preparing cross sections that have <br /> lithological correlations with interpretations of the subsurface and including them in site conceptual <br /> models (SCM) prepared for each site. The following is a synopsis of the status and/or site specific <br /> discussions at the meeting. <br /> 3011 Benjamin Holt Stockton <br /> A third geologic cross section is to be prepared that extends from the contaminant source area to <br /> newly installed monitoring well MW13 and is to be included in an updated SCM. In the conclusions <br /> and recommendations of the August 14,2004,SCM,it was stated that MTBE was no longer a fuel <br /> component at this site,that concentrations of MTBE were declining and expected to continue <br /> declining and that case closure may be warranted. If this is the conclusion and recommendation of <br /> the updated SCM,then a closure report should be prepared as discussed in the Tri-Regional Board <br /> Staff Recommendations dated April 16,2004. <br /> 1313 Charter Way Stockton <br /> An SCM is to be prepared for this site and can be included in the next quarterly monitoring report. <br /> The contaminant of concern at this site is 1,2-DCA. If it can be demonstrated that the 1,2-DCA <br /> plume has been adequately characterized on-site and off-site and that action to remediate the mass of <br /> contamination is not necessary, then a closure report should be prepared as discussed in the Tri- <br /> Regional Board Staff Recommendations dated April 16,2004. <br /> 620 Charter Way Stockton <br /> The comments provided in the EHD letter dated May 18,2005,were discussed. It was agreed that <br /> CPT borings would be advanced and the data would be used to decide where monitoring wells <br /> would be installed. <br /> 440 Charter Way,Stockton <br /> It was stated that the off-site property owner had not responded to the access agreement request. <br /> Cambria will follow up on securing an access agreement and proceed with implementation of the <br /> work plan approved December 13,2004. <br />
The URL can be used to link to this page
Your browser does not support the video tag.