My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2900 - Site Mitigation Program
>
PR0503634
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 4:40:56 PM
Creation date
5/7/2019 4:15:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0503634
PE
2950
FACILITY_ID
FA0005914
FACILITY_NAME
VICTOR ROAD SHELL
STREET_NUMBER
880
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905032
CURRENT_STATUS
02
SITE_LOCATION
880 VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRMMENTAL HEALT n DEPARTMENT <br /> po�,N SAN JOAQUIN COUNTY <br /> Unit Su ervisors <br /> Q- ? Donna K.Heran,R.E.H.S. p <br /> Director 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> At Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> • <br /> Program Manager Telephone: (209) Douglas W.Wilson,R.E.H.S. <br /> c9<ico RN`P <br /> Laurie A.Corolla,R.E.H.S. P ( ) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Program Manager Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> KAREN PETRYNA <br /> EQUILON ENTERPRISES LLC <br /> P O BOX 7869 <br /> BURBANK CA 91510-7869- <br /> RE: SHELL SERVICE STATION SITE CODE: 1746 <br /> 880 VICTOR ROAD <br /> LODI CA 95240 <br /> WORKPLAN:Soil Vapor Extraction Work Plan DATED: August 22. 2003 <br /> PREPARED BY: Cambria Environmental Technology Inc <br /> APPROVED <br /> DISAPPROVED 0 <br /> ADDENDUM 0 Submit by <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORKPLAN (H&S <br /> 25299.37,subd.(c)(3).): <br /> 1. Install three soil vapor extraction (SVE) wells: SVE-1 and SVE-3 to 35 feet bsg, and <br /> SVE-2 to 40 feet bsg. <br /> 2. Conduct a short-term SVE step test from the 3 SVE to determine optimum vapor <br /> flow rates. <br /> 3. Conduct a long-term 5-day test based on the results of the short-term SVE test. <br /> COMMENTS AND CONDITIONS: <br /> 1. Installation of the 3 SVE wells has been scheduled for September 16 through 18, <br /> 2003. <br /> 2. Scheduled SVE test for October 6 through 10, 2003. <br /> ? r �i <br /> DATED S J Zev-3 BY \ , <br /> C: CRWQCB, Central Valley Region—James L. L. Barton,RG <br /> C: Cambria Environmental Technologies, Inc.—Aubrey Cool <br />
The URL can be used to link to this page
Your browser does not support the video tag.