Laserfiche WebLink
ENVIRMMENTAL HEALT n DEPARTMENT <br /> po�,N SAN JOAQUIN COUNTY <br /> Unit Su ervisors <br /> Q- ? Donna K.Heran,R.E.H.S. p <br /> Director 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> At Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> • <br /> Program Manager Telephone: (209) Douglas W.Wilson,R.E.H.S. <br /> c9<ico RN`P <br /> Laurie A.Corolla,R.E.H.S. P ( ) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Program Manager Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> KAREN PETRYNA <br /> EQUILON ENTERPRISES LLC <br /> P O BOX 7869 <br /> BURBANK CA 91510-7869- <br /> RE: SHELL SERVICE STATION SITE CODE: 1746 <br /> 880 VICTOR ROAD <br /> LODI CA 95240 <br /> WORKPLAN:Soil Vapor Extraction Work Plan DATED: August 22. 2003 <br /> PREPARED BY: Cambria Environmental Technology Inc <br /> APPROVED <br /> DISAPPROVED 0 <br /> ADDENDUM 0 Submit by <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORKPLAN (H&S <br /> 25299.37,subd.(c)(3).): <br /> 1. Install three soil vapor extraction (SVE) wells: SVE-1 and SVE-3 to 35 feet bsg, and <br /> SVE-2 to 40 feet bsg. <br /> 2. Conduct a short-term SVE step test from the 3 SVE to determine optimum vapor <br /> flow rates. <br /> 3. Conduct a long-term 5-day test based on the results of the short-term SVE test. <br /> COMMENTS AND CONDITIONS: <br /> 1. Installation of the 3 SVE wells has been scheduled for September 16 through 18, <br /> 2003. <br /> 2. Scheduled SVE test for October 6 through 10, 2003. <br /> ? r �i <br /> DATED S J Zev-3 BY \ , <br /> C: CRWQCB, Central Valley Region—James L. L. Barton,RG <br /> C: Cambria Environmental Technologies, Inc.—Aubrey Cool <br />