My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008942
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2900 - Site Mitigation Program
>
PR0503634
>
ARCHIVED REPORTS XR0008942
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 4:57:13 PM
Creation date
5/7/2019 4:25:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008942
RECORD_ID
PR0503634
PE
2950
FACILITY_ID
FA0005914
FACILITY_NAME
VICTOR ROAD SHELL
STREET_NUMBER
880
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905032
CURRENT_STATUS
02
SITE_LOCATION
880 VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A M B R I A Mr Jeffrey Wong <br /> July 27, 2005 <br /> approximately 3 33 pounds of MTBE Cambria's December 13, 2002 Aquifer Pump Test Report <br /> summarizes the test activities <br /> 2003 Well Installation During July 2003, Cambria installed three off-site wells (MW-8, MW-9, <br /> and MW-10) and one deep on-stte well (MW-11) No TPHg, BTEX, or fuel oxygenates were <br /> detected in soil from well borings MW-8, MW-9, or MW-10,although the samples were analyzed <br /> outside of hold time Soil samples were not collected from well boring MW-11 because it is <br /> located near MW-1 These results complete lateral definition of petroleum hydrocarbons and fuel <br /> oxygenates in soil at this site Cambria's December 3, 2003 Site Investigation/Third Quarter <br /> Groundwater Monitoring Report and Site Conceptual Model describes this investigation <br /> 2003 SVE Test During September 2003, Cambria installed three SVE wells (SVE-1, SVE-2, and <br /> SVE-3) During October 2003, Cambna performed a 5-day SVE test using these wells During <br /> this test, approximately 2 68 pounds of TPHg and 142 pounds of MTBE were removed Due to <br /> low influent concentrations which indicate that there is insignificant impact to the source area, <br /> Cambria did not recommend additional SVE Cambria's November 14, 2003 Soil Vapor <br /> Extraction Test Report documents this test <br /> 2003 Interim GWE events During September, October, and December 2003, Cambria conducted <br /> . three batch GWE events During each event, Cambria extracted groundwater continuously from <br /> well MW-4 for 5 days During these events, approximately 19,850 gallons of groundwater were <br /> extracted, removing 8 04 pounds of MTBE Cambria's September 16, 2004 Interim Remediation <br /> Report/Work Plan/Response Letter presents the interim remediation results <br /> Groundwater Monitoring Program There are currently eight groundwater monitoring wells on <br /> site (MW-1 through MW-7 and MW-11), two piezometers (P-1 and P-2) on site, and three off- <br /> site groundwater monitoring wells (MW-8, MW-9, and MW-10), which are gauged and sampled <br /> quarterly Current depths to water in all wells and piezometers range from 49 to 51 feet below <br /> grade (fbg) During the second quarter 2005 sampling event, MTBE was detected in wells <br /> MW-1, MW-3, MW-4, MW-5, MW-7, P-1, and P-2 at concentrations ranging from 2 4 to <br /> 1,400 ppb The laboratory noted that the samples from wells MW-7 and P-1 were analyzed <br /> outside the EPA recommended hold time TBA was detected in wells MW-1 through MW-4, <br /> MW-7, P-1, and P-2 at concentrations ranging from 29 to 96,000 ppb The laboratory noted that <br /> the samples from wells MW-7 and P-1 were analyzed outside the EPA recommended hold time, <br /> and the result for P-1 (96,000 ppb) is an estimated value because the concentration exceeded the <br /> calibration of the analysis Well MW-7 also contained 2 4 ppb TAME, and piezometer P-1 <br /> contained 5 5 ppb ETBE and 2 6 ppb TAME Samples were not analyzed for TPHg and BTEX <br /> during this sampling event Samples from all wells are analyzed for TPHg and BTEX annually <br /> during the first quarter <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.