My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2900 - Site Mitigation Program
>
PR0503634
>
ARCHIVED REPORTS XR0009020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 4:58:59 PM
Creation date
5/7/2019 4:45:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009020
RECORD_ID
PR0503634
PE
2950
FACILITY_ID
FA0005914
FACILITY_NAME
VICTOR ROAD SHELL
STREET_NUMBER
880
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905032
CURRENT_STATUS
02
SITE_LOCATION
880 VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i ! <br /> CAMBRIA <br /> Table 1 Well/Boring Data,Former Shell Service Station/Econo Gas,880 Victor Road,Lodi,California <br /> Boring TOC Total Soil Sample First Encountered GW Screen Screen Depth(fbg) <br /> Name Type Date Elev(ft msl) Depth(fbg) Interval(ft) De2th(fbg) Elev(ft msl) Diam (in) Top Bottom Comments <br /> GP-1 Geoprobe boring 22-Feb 96 22 Continuous <br /> GP-2 Geoprobe boring 22-Feb-96 - 33 Continuous - - Angle boring <br /> GP-3 Geoprobe boring 01-Nov-99 12 Continuous - <br /> GP-4 Geoprobe boring 01-Nov-99 10 Continuous <br /> GP 5 Geoprobe boring 01-Nov-99 12 Continuous <br /> GP-6 Geoprobe boring 01-Nov-99 11 Continuous - <br /> SB-1 6-mch HSA boring 14-Jan-99 415 5 - <br /> SB-2 4-inch HSA boring 14-Jan-99 415 5 - <br /> SB-3 4-inch HSA boring 15-Jan-99 60 5 50 - - <br /> SB-4 6-inch HSA boring 15-Jan-99 65 5 50 - <br /> SB-5 4-inch HSA boring 15-Jan-99 415 5 - - - <br /> CPT-1 CPT boring 01-Oct 01 10006 Continuous 55 - <br /> CPP-2 CPT boring 01-Oct-01 10006 Continuous 54 - <br /> CPT-3 CFr boring 03-Oct-01 6004 Continuous NM <br /> CPT-4 CPT boring 03-Oct-01 - 6004 Continuous NM <br /> CPT-5 CPT boring 03-0ct-01 7005 Continuous NM - <br /> CPT-6 CPT boring 02-Oct-01 - 6004 Continuous NM - - - _ <br /> P-1 8-inch HSA well boring 11-Sep-02 5422 63 5 54 022 2 48 63 Piezometer <br /> P-2 8-inch HSA well boring 10-Sep-02 5451 63 5 49 551 2 48 63 Piezometer <br /> MW-1 10-inch HSA well boring 02-Nov-99 5455 58 5 49 555 4 43 58 Groundwater monitoring well <br /> MW-2 10-inch HSA well boring 03-Nov-99 5507 58 5 49 607 4 43 58 Groundwater monitoring well <br /> MW-3 10-inch HSA well boring 02-Nov-99 5387 615 5 48 587 4 43 58 Groundwater monitoring well <br /> MW-4 12-inch HSA well boring 10-Sep-02 5411 63 5 535 061 6 48 63 Groundwater extraction well <br /> MW-5 10-inch HSA well boring 11-Sep-02 5421 63 Continuous 53 121 4 48 63 Groundwater monitoring well <br /> MW-6 10-inch HSA well boring 04-Sep-02 5456 60 5 50 456 4 45 60 Groundwater monitoring well <br /> MW-7 10-inch HSA well boring 03-Sep-02 5455 65 5 55 -045 4 47 62 Groundwater monitoring well <br /> SVE-1 10-mch HSA well boring I8-Sep-03 - 315 5 - - 4 15 30 Vapor extraction well <br /> SVE-2 10-mch HSA well boring 17-Sep-03 - 315 5 - 4 15 30 Vapor extraction well <br /> SVE-3 10-inch HSA well boring 18-Sep-03 - 36.5 5 - - 4 15 30 Vapor extraction well <br /> 0955 Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.