Laserfiche WebLink
i <br /> CAMBRIA <br /> Report Preparation• Following the receipt of analytical results from the laboratory, Cambria <br /> will prepare a written report which will include field procedures, laboratory results, boring logs, <br /> an updated site conceptual model, and conclusions and recommendations <br /> The scope of work described in this work plan will be performed under the supervision of a <br /> registered geologist or engineer <br /> Schedule <br /> Cambria is prepared to begin the work proposed in this work plan upon receiving written <br /> approval of this work plan by SJCEHD, receipt of appropriate drilling permits from SJCEHD, <br /> and access to the property east of the subject site As discussed above, Shell is currently <br /> pursuing access to two additional adjacent properties to install the three offsite wells proposed in <br /> Cambria's June 5, 2002 Site Investigation Work Plan Shell intends to install all five offsite <br /> wells and the deep onsite well during the same field event However, if access to one of the <br /> adjacent properties is delayed, Shell will proceed with the portion of the work that is authorized <br /> . CLOSING <br /> If you have any questions regarding the contents of this document, please call Aubrey Cool at <br /> (510)420-3336 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> Aubrey Cool <br /> Project Geologist <br /> D GEO� <br /> HW O <br /> Joe W Neely,RG �Opy�e tiFC�� <br /> Senior Project Geologist <br /> RG 6927 No 6927 <br /> OF CALICA� <br /> 0955 11 <br />