My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
900
>
3500 - Local Oversight Program
>
PR0544434
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2019 10:08:47 AM
Creation date
5/8/2019 9:47:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
RECORD_ID
PR0544434
PE
3528
FACILITY_ID
FA0003769
FACILITY_NAME
TERESI TRUCKING LLC
STREET_NUMBER
900
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905026
CURRENT_STATUS
02
SITE_LOCATION
900 1/2 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 8. a. Describe the method that will be utilized to purge and/or inert the tank(s): <br /> Tank(s) and line(s) will first be triple-rinsed and pumped out. Next, the <br /> appropriate amount of dry ice (15 lbs. per 1,000 gal. 'cap. diesel and 30 lbs. <br /> gasoline) will be added to the tank(s) and then itnoniEored with an LLL meter. <br /> b. Tank/Pipe hauler: Jim Thorne Oil Co..i. Inc <br /> Address: 351 N. Beckman Road 1 P.O. Box 357City: Lodi, CA zip: 95341-0357 <br /> Plione No. 916 462-4581 <br /> i� <br /> Hauler Registration# (if hauled as hazardous): 2667 <br /> C. Tank/Piping Disposal Site: <br /> Name: Schnitzer Steel iil-odllci5 <br /> Address: 121HH1 leolsoin_1lutrleviut-d (•ily: -_Itirn4l1_t Cortlovst_ Zip: _95742_ <br /> Phone No. 916 985-4810 <br /> EPA 1D#: (if transported to a perruil(ed TSD facility): !� <br /> 9. Describe, in detail, how the soil and/or water sample(s) beneath the tank ani/ piping will be obtained: <br /> After tank removal we will excavate 2 to 3 feet tinder;4lie former tank location Into <br /> native soil at tile app appropriate riate locations with the backhoe at4he direction of the ETID <br /> representative on site. Samples will be taken from the backhoe bucket. <br /> it <br /> 10. Describe liow the excavation will be backfilled with suitable material upon removal: <br /> Backfill of the excavation will be completed at the appropriate time during this project. <br /> A determination of the most cost-effective method will be.'' made and undertaken. Fill <br /> material will be what is the most cost-effective for tite final desired condition. <br /> 11. Handling of excavated soil: <br /> a) What material will be used to line the tank pit and cover the stockpile? <br /> 6 mil thick plastic sheeting <br /> b) What will be the Final destination of the excavated stockpile? I� <br /> A determination will be made at the appropriate:time. <br /> c) Contaminated Soil Hazardous Waste Hauler: <br /> Names: Dillard Trucking Hauler Registration#: 1745 <br /> Address: 3291 Byers Road 1 Rt. 1 Bx 73 City:;' B' ron CA zip: 94514 <br /> Phone Na. 415 634-6850 <br /> Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.