My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
900
>
3500 - Local Oversight Program
>
PR0544434
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2019 9:55:24 AM
Creation date
5/8/2019 9:48:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544434
PE
3528
FACILITY_ID
FA0003769
FACILITY_NAME
TERESI TRUCKING LLC
STREET_NUMBER
900
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905026
CURRENT_STATUS
02
SITE_LOCATION
900 1/2 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l� <br /> im <br /> Thorpe Oil , nc . <br /> l� I <br /> 351 N. BECKMAN RD. • P.O. BOX 357 <br /> LODI, CA 95241-0357 l <br /> (209)368-6175 • (209)462-4581 • CONTRACTORS LICENSE #495699 <br /> i <br /> December 13, 1995 <br /> Todd Teresi <br /> Teresi Trucking, Inc. <br /> 900 112 E. Victor Rd. <br /> Lodi, CA 95240 <br /> Dear Sir: 'I <br /> i' <br /> Re: Treatment of the diesel and gasoline contaminated soil stock <br /> piled at the above mentioned address. . <br /> This proposal includes the following: <br /> 1 . Formulation and submittal to San Joaquin Health Services/ EHD a <br /> treatment work plan and schedule. <br /> 2. Move in and out of all the equipment necessary to mix and treat the <br /> approximately 500 cubic yards of contaminated soil on site. <br /> 3. Supply all ingredients to successfully complete the treatment process. <br /> 1 4. Treat and stockpile soil in space provided by Teresi. <br /> 5. Provide up to five soil samples to confirm suecessflul treatment. G <br /> Additional samples over this amount will be c` orgy d at $100.00 per <br /> sample. Samples are to be tested for TPH-Gasoline, Diesel and BTEX <br /> on normal turn around of 5 days. :E <br /> 6. Actual volume of soil treated will be determined utilizing the belt scale <br /> located on the mixer. Adjustments will be made upon completion of <br /> the project. <br /> .t <br /> Total estimated cost for the above based upon 500 cu. yds. or 750 tons <br /> is 11,500.00 f <br /> I� E <br /> f� o <br /> Notes: I j <br /> J <br /> 1 . If any regulatory agency has additional requirements for the <br /> completion of this tank removal project, owner will be responsible for <br /> additional costs. <br /> i <br /> I} � <br /> I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.