My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
900
>
3500 - Local Oversight Program
>
PR0544434
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2019 9:55:24 AM
Creation date
5/8/2019 9:48:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544434
PE
3528
FACILITY_ID
FA0003769
FACILITY_NAME
TERESI TRUCKING LLC
STREET_NUMBER
900
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905026
CURRENT_STATUS
02
SITE_LOCATION
900 1/2 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I� <br /> F 'R <br /> All site safety records pertaining to the site characterizatiodstudy will be maintained <br /> by the Safety Coordinator/Project Manager throughout the pro}ect. <br /> 1 AIR MONITORING <br /> The Safety Coordinator/Project Manager will conduct periodic air monitoring using <br /> direct reading sampling equipment as required. At a minimum the following <br /> monitoring will be performed: i <br /> Total Organic Vapors <br /> A direct reading photoionization detection (PID) meter'(HNU PI 101 or <br /> equivalent) will be used to monitor the concentrations of organic vapors in <br /> the work area. Measurements will be taken at least once every 15 minutes <br /> during surface and subsurface sample collection. The meter will be <br /> calibrated for benzene. Total organic vapor measurements will be used to <br /> determine the appropriate levels of respiratory protection and conditions for <br /> site evacuations. Total organic vapor concentrations in the workers' <br /> breathing zone in excess of 10 ppm above background will trigger an <br /> upgrade from level D to level C protection. Breathing zone concentrations � <br /> in excess of 250 ppm will stop the work on-site until the work zone <br /> concentrations are reduced to below 250 ppm. <br /> { <br /> y <br /> EMPLOYEE TRAINING AND INFORMATION ;l <br /> All personnel working have completed the certified, .40-hour OSHA hazardous waste <br /> training course, and have been trained in the following objectives: <br /> • Workers are aware of potential hazards they 'may encounter. <br /> • Knowledge and skills necessary to perform the work with minimal risk to <br /> workers' health and safety. f R <br /> 1 <br /> • Familiarization with the Site Safety Plan and site-specific requirements. I <br /> � r <br /> The training plan for this site encompasses: 4 <br /> • Potential physical and chemical health hazards <br /> • Respiratory protection, rationale, use, maintenance and fit testing. <br /> • Protective clothing, use and maintenance' , <br /> • Entry, exit and decontamination procedures. <br /> • Documentation and record keeping procedures <br /> i� ; I <br /> I <br /> 'I <br /> p <br /> I' <br /> rp I <br /> R I <br /> :r <br /> ,I <br /> 3 <br /> .1 I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.