My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
3408
>
2300 - Underground Storage Tank Program
>
PR0517521
>
INSTALL 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:38:25 AM
Creation date
5/8/2019 11:47:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2002
RECORD_ID
PR0517521
PE
2361
FACILITY_ID
FA0013484
FACILITY_NAME
FOOD 4 LESS FUEL CENTER*
STREET_NUMBER
3408
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16422011
CURRENT_STATUS
01
SITE_LOCATION
3408 MANTHEY RD
P_LOCATION
01
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLASTEEL@ELUTRONO Double-wall <br /> INSTALLATION INSTRUCTIONS Tank <br /> I. GENERAL may set and securely anchor the ELUTRON® tank on the pad <br /> The PLASTEEL° ELUTRON° underground tank is a with a minimum of 6"of backfill between tank bottom centerline and <br /> U.L. Listed Jacketed tank providing corrosion protection and 360° the pad. Upon AHJ approval, you may set and securely anchor theELUTRON®tank directly on the smooth, flat pad taking care to <br /> secondary containment per U.L. 1746 and 58. place a 12" wide x 1" thick piece of felt between the entire tank <br /> ELUTRON®underground tanks must be installed according to bottom centerline and the pad to minimize damage during placement. <br /> these installation instructions, the latest issue of the Flammable and Consult factory for other anchoring techniques. <br /> Combustible Liquids Code,N.F.P.A.30 for underground tanks and the <br /> Authority Having Jurisdiction(AHJ). VI. TESTING <br /> The installer and/or owner must read and be familiar with the entire PRE-INSTALLATION: Aboveground, prior to replacement of <br /> installation instructions and Appendix A prior to installing the tank in excavation, precisely follow one of the three testing options <br /> ELUTRON® tank. To activate the PLASTEEL® cited in Appendix A attached.Do not deviate from theseprocedures.If <br /> ELUTRON®Tank Warranty, a completed and signed Certificate the ELUTRON® tank is delivered with a vacuum on the <br /> of Installation for the PLASTEEL® ELUTROW interstice,refer to Option#2 of Appendix A. <br /> Underground Tank must be returned to the manufacturer. For <br /> additional installation references,consult the current editions of: CAUTION: IF OPTION #3 IS USED, DO NOT APPLY ANY <br /> — Petroleum Equipment Institute,RP-100 PRESSURE TO THE INTERSTICE BEFORE THOR- <br /> - American Petroleum Institute,RP-1615. OUGHLY UNDERSTANDING AND FAITHFULLY <br /> If tank will be stored above ground more than 30 days,consult the FOLLOWING THE PROCEDURES CITED IN <br /> manufacturer for procedures. OPTION#3 OF APPENDIX A. DAMAGE TO TANK <br /> MAY OCCUR IF YOU DEVIATE FROM THE PRO- <br /> Products stored in the ELUTRON®tank must not exceed 150° CEDURES AND SPECIFICATIONS. <br /> (66° Q. The ELUTRON®tank shall be maintained per API <br /> RP 1621,Appendix D. POST-INSTALLATION:Complete the backfill procedures to the <br /> top of the tank. Complete all piping and connections ensuring that <br /> II. VISUAL INSPECTION unused openings are secured tight with threaded steel plugs.Apply a 5 <br /> Prior to setting tank in hole, inspect exterior for damage. If tank PSIG pressure test in the primary tank and check for tightness of pip- <br /> exterior is damaged, call factory regarding correct repair procedures. ing connections and tank manhole covers. Gauge should be checked <br /> Exterior damage is indicated when the blue color of the FRP prior to testing for accuracy and have a maximum limit of 15 PSIG. <br /> laminate has shown a white fractured pattern. CAUTION: THE PRIMARY TANK TEST PRESSURE SHALL <br /> III. HANDLING NOT EXCEED 5 PSIG. DAMAGE TO TANK <br /> MAY OCCUR. ISOLATE PIPING FROM TANK <br /> Good construction engineering practice, common sense and safety BEFORE TESTING THE PIPING AT HIGHER <br /> must prevail during this phase. ELUTRON® tanks are not to be PRESSURES. <br /> dropped or rolled off of the delivery vehicle onto the ground or into the <br /> hole.The lifting hook or hooks provided must be used in combination The interstice(annular space)will be tested using option#2 or#3 <br /> with the proper capacity unloading equipment. It is the responsibility in Appendix A. <br /> of the owner to provide the qualified personnel and safe, proper OPTION: Request Appendix B for procedures to perform the <br /> unloading equipment,with specific consideration given to tank weight Interstitial Vacuum Test that has been third party <br /> and reach distance to set tank in excavation.The preferred lifting cable evaluated to meet the EPA tank tightness test <br /> included angle is 60°and must never exceed 120°.A spreader bar may protocol. <br /> be used to achieve this angle. <br /> IV. EXCAVATION DEPTH, VII. VENTING <br /> BEDDING AND BACKFILL The primary tank must be vented to atmospheric pressure except <br /> Follow all applicable local regulations and codes. When excavat- for use with a vapor recovery system,provided the pressure or vacuum <br /> ing,allow a minimum clearance of 6"for backfill around the tank.For does not exceed I psi (6.9 kpa). Compliance is required for under- <br /> minimum burial cover,consult N.F.P.A.30.If burial cover over top of ground tank venting in N.F.P.A. 30. The interstitial space does not <br /> tank exceeds five(5)feet,consult factory.Backfill materials should be require venting.It is recommended that the interstice be sealed air tight. <br /> clean, debris free, sand or pea gravel. Hydrocarbon exposed sand or CAUTION: DO NOT MANIFOLD VENT FROM PRIMARY <br /> pea gravel may be re-used if approved by the AHJ. Native sand may <br /> be used if approved by the tank manufacturer and the AHJ. Allow a TANK TO VENT FROM INTERSTITIAL SPACE. <br /> minimum of 12"of backfill between traffic slab and all appurtenances VIII. PLASTEEL® SEALING <br /> that are attached to the tank. Damage to tank may occur if surface <br /> traffic loads are transmitted directly to tank. PROCEDURES <br /> V. ANCHORING SYSTEMS These procedures must be performed prior to completion of back- <br /> CAUTION: The decision to use an anchoring system is the fill and AFTER TESTING. To ensure complete corrosion protection, <br /> responsibility of the owner. Damage to the tank may the following instructions must be followed: <br /> occur if the tank is subjected to movement. a. General instructions for working with fiberglass resin <br /> Consult the factory for number, size and type of holddown By carefully performing the following steps, your ELUTROW <br /> assemblies required when using a concrete pad under the tank.You tank will be fully protected from corrosion.The kit includes materials <br />
The URL can be used to link to this page
Your browser does not support the video tag.