Laserfiche WebLink
(3)A list of facility employees who have been trained by the designated UST operator(s), <br /> shall be maintained on-site or off-site at a readily available location, if approved by the <br /> local agency. The list shall be provided to the local agency upon request. The list shall <br /> include the dates of training for all facility employees, and the hiring dates for all facility <br /> employees hired on or after July 1, 2005. <br /> 4 The Airport Way facility had some monthly designated operator inspections performed <br /> by an individual not previously identified on the statement submitted to this office. <br /> 4 The Airport Way facility did not have the January 2005 designated operator inspection <br /> report onsite at the time of the June 17, 2005, UST inspection. <br /> —> The designated operator reports for the Cherokee Lane facility did not document all of <br /> the minimum requirements as stated in CCR 2715(c). <br /> 4 The Wilson Way facility did not have the August, September, October, and November <br /> 2005 designated operator inspection report onsite at the time of the February 27, 2006, <br /> UST inspection. <br /> V. ATTACHMENTS <br /> Attachment 1 —June 17, 2005 routine UST inspection report for Airport Way facility <br /> Attachment 2—June 17, 2005 monitoring certification test report for Airport Way facility <br /> Attachment 3 —November 30, 2005 secondary containment test report for Airport Way facility <br /> Attachment 4—March 21, 2006 secondary containment test report for repaired components at <br /> the Airport Way facility <br /> Attachment 5 —June 8, 2006 routine UST inspection report for Airport Way facility <br /> Attachment 6—August 7, 2006 follow up letter to June 8, 2006 routine UST inspection report for <br /> Airport Way facility <br /> Attachment 7—February 28, 2005 fax to Mr. Silva regarding secondary containment testing <br /> Attachment 8 —January 20, 2006 routine UST inspection report for Cherokee Lane facility <br /> Attachment 9—January 20, 2006 routine HW inspection report for Cherokee Lane facility <br /> Attachment 10—November 30, 2005 secondary containment test report for Cherokee Lane <br /> facility <br /> Attachment 11 —February 21, 2006 monitoring certification test report for Cherokee Lane <br /> facility <br /> Attachment 12—February 21, 2006 monitoring certification inspection report for Cherokee Lane <br /> facility <br /> Attachment 13 —February 28, 2006 leak detector test report for Cherokee Lane facility <br /> Attachment 14—March 23, 2006 secondary containment test report for repaired components at <br /> the Cherokee Lane facility <br /> Attachment 15 — Statement of corrections regarding January 20, 2006 UST and HW inspections <br /> at the Cherokee Lane facility <br /> Attachment 16—August 7, 2006 follow up letter to January 20, 2006 routine UST and HW <br /> inspection reports for Cherokee Lane facility <br /> Attachment 17 —January 16, 2003 routine UST inspection report for Manthey Road facility <br /> Attachment 18 —January 16, 2003 monitoring certification test report for Manthey Road facility <br /> Page 18 of 20 <br />