Laserfiche WebLink
Feb 16 04 11:00a Fra'zen Hill <br />5596r'81467 <br />p.9 <br />F. In -Tank Gauging/ SIR Equipment: Check this box if tank gauging is used only for inventory control. <br />El Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes <br />❑ <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />I ❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />f mmnteta thr fntlnwino chrcklict- <br />es <br />❑ No* <br />❑ N/A <br />For equipment start-up or annual equipment certification, was a Ieak simulated to verify LLD performance? <br />(Check all that apply) Simulated Ieak rate: V<3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />3 Yes <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />J Yes <br />❑ No* <br />NIA <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />Yes <br />No* <br />13 N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />3 Yes <br />4 No* <br />Cl N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />or disconnected? <br />a Yes <br />a No* <br />❑ N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />or fails a test? <br />3 Yes <br />jNo* <br />❑ N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />'Yes <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />' In the Section H. <br />below. describe how and when these deficiencies were or will be corrected. <br />K. Comments: <br />Page 3 of 3 03MI <br />