Laserfiche WebLink
Dec 31 02 11:04a <br />SWRCB, January 2002 <br />Fra rn Hill <br />5596 <br />9. SPILL/nVFRFILL CnNTA1NMF.NT ROWS <br />467'"'''" p.12 <br />MAR 2 6 2003 <br />Page % of <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: <br />0 Spill Bucket Manufacturer E Industn, Standard E Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />0 Pressure ❑ Vacuum ❑ Hydrostatic <br />G Other (Specify) <br />Test Equipment Used: <br />=07 <br />Bucket Diameter: <br />Equipment Resolution: <br />Spill Box # Spill BOX # Spill Box # Spill B03,0 <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (Rt): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-RO: <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />❑ Pass G Fail <br />❑ Pass 0 Fail ❑ Pass E—FaiI7 <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for•failed tests) <br />\ A <br />Signature of Company Representative <br />