Laserfiche WebLink
JAN -21 -2003 -TUE 01:21 PM <br />Dec 31 02 11:04a <br />SWRCB, January 2002 <br />Franzen Hill <br />555��81467 <br />9_ SPTT,I,/"VNR1RTT.T.('f1NtAi1�7MTiNTRilY�C <br />P. 008 <br />p.12 <br />Page 7 of /Z <br />Facility is Not Equipped With Spill/Overfill Containment Boxes 0 <br />Spill/Overfill Containment Boxes are Present, but were Not Tested 0 <br />Test Method Developed By: <br />0 Spill Bucket Manufacturer <br />0 Industry Standard Cl professional Engineer <br />0 Other (Spec) <br />Test Method Used: <br />p Pressure <br />0 Vacuum 0 Hydrostatic <br />0 Other (Speci) <br />Test Equipment Used: <br />Mmi <br />Equipment Resolution: <br />Spill Box # Spill Box # Spill Box # Spill Box tt <br />Buckct Diameter: <br />Hucket Depth: <br />Wait timc between applying <br />pressure/vacuum/water and <br />startins, test: <br />Test Start Time: <br />Initial Reading (RI)-- <br />RI)-Test <br />TestEnd Time.- <br />ime:Final <br />FinalReading (Rf): <br />Test Duration: <br />Change in Reading (RF-R,)� <br />Pass/Fail Threshold or <br />Criteria? <br />Test liesult: <br />❑ Pass ❑ Fail 0 Pass <br />0 Fall 0 Pass 0 Fail ❑ Pass 0 Fail <br />Comments — (include information on repairs made prior to testing, and recommendedfollow-upfor ailed tests <br />1 <br />Signature of Company Representative <br />.i <br />