Laserfiche WebLink
SWRCB, January 2002 Page of <br /> 4711—D# fj 3 9. SPILL/OVERFILL CONTAINMENT BOXL. Z 0 y/ <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer ndus S d Professional Engineer <br /> Other(.Sped) <br /> Test Method Used: Pressure Vacuum drostat�c <br /> Other(Spec) <br /> Test Equipment Used: U t SUc( Equipment Resolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bu77 <br /> cket Depth: 13L <br /> L <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: �n h^/ JL�M JD 6 �v�^ /o /U� /p <br /> Test Start Time: ,S S S 2, c D <br /> Initial Reading(Rj): 4 zp 1/z S'/L <br /> Test End Time: 3 ' S7 -? 3' SL 1 c5- ` W <br /> Final Reading(RF): <br /> Test Duration: / �i,� �/, ��,� /�� �•� ��� �� l`i <br /> Change in Reading(RF-R0): 3/ <br /> Pass/Fail Threshold or <br /> Criteria: PA 5,5 11 5 7 I &45s ML, <br /> Test Result: ' esl Bw <br /> C ct J 7 S7-so--A S7 SCS:,-/t ( �' <br /> 1i. A <br /> Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />