My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1997 - 2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1100
>
2300 - Underground Storage Tank Program
>
PR0506504
>
COMPLIANCE INFO 1997 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 4:09:41 PM
Creation date
5/10/2019 2:31:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997 - 2005
RECORD_ID
PR0506504
PE
2361
FACILITY_ID
FA0007464
FACILITY_NAME
MAIN STREET ARCO AM PM*
STREET_NUMBER
1100
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22119062
CURRENT_STATUS
01
SITE_LOCATION
1100 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 7 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ®Pressure ❑ Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: DIAL GAUGE Equipment Resolution: 0 to 15°psi <br /> Piping Run# T 7 Piping Run# 9 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: 4 fT oti e>'4-'j 4,41RP,v <br /> Piping Diameter: 3 ki 3 3 <br /> Length of Piping Run: 5 D ' s J Sr)' <br /> Product Stored: G Y 7 9 <br /> Method and location of <br /> piping-run isolation: w� /3— % <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test: <br /> Test Start Time: : 3,> 8 ' 3,-n T= 3 o <br /> Initial Reading(Rj): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time: 9 , 30 9 <br /> Final Reading(RF): 5 PSI S PSI S PSI PSI <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-RI): 0% PSI PSI )6 PSI PSI <br /> Pass/Fail Threshold or Zero Zero Zero Zero <br /> Criteria: <br /> Test Restut f_ pss Pass rail Passai> L51Pass [ � <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Arco 6313 <br /> 1100 S. Main St. <br /> Manteca, Ca 95337 <br /> N05789 SB 989 Testing <br />
The URL can be used to link to this page
Your browser does not support the video tag.