Laserfiche WebLink
SWRCB,January 2002 Page ,2 of <br /> 4. SPILLlOVERFILL CONTAUgNMNT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacwrer (-r&usfry Stan4F Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum y ostatic <br /> Other(Specify) <br /> Test Equipment Used: („_,_ Equipment Resolution: <br /> Spill Boz# Spill Boz# Spin Box# Spill Boz# <br /> Bucket Diameter: / ( �1 t it l I /! / /l <br /> Bucket Depth: " // / 112L J/2— / S�/z IV eL <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> stardn test: 3 Mf 3 4D 3 v 3Z> -70 ?-L> <br /> Test Start Time: / /0'3.)L '303 <br /> Initial Reading(F.0: / L ISL <br /> Test End Time: j 2- X3 2- //'1 2 1. -L //'39- <br /> Final <br /> '3 Final Reading(RF): chi .:flt2— 4 <br /> Test Duration: �1/Z fq/l <br /> Change in Reading(RF-Rj): Q © <br /> Pass!Fail Threshold or e-- <br /> Criteria: <br /> rCriteria: <br /> Test Result: as Pal ' Pa lE� a Eltll <br /> FCk 7 LAE-wr r=ASY 4( <br /> rRL 000 <br /> Comments— (include in ormation on repairs made pnor to testing, and recommendedfollow-up or ailed tests <br />