My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1997 - 2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1100
>
2300 - Underground Storage Tank Program
>
PR0506504
>
COMPLIANCE INFO 1997 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 4:09:41 PM
Creation date
5/10/2019 2:31:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997 - 2005
RECORD_ID
PR0506504
PE
2361
FACILITY_ID
FA0007464
FACILITY_NAME
MAIN STREET ARCO AM PM*
STREET_NUMBER
1100
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22119062
CURRENT_STATUS
01
SITE_LOCATION
1100 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Double Fill Configuration <br /> 1. OPW Double Fill Configuration shall be allowed for installation provided that no <br /> more than two fill and two vapor return points are installed on any single <br /> underground storage tank and that no offset of the vapor recovery riser pipe is <br /> installed. An example of a OPW Dual Fill configuration in shown in Figure 2C. <br /> 2. The OPW Double Fill Configuration can also be used in the single fill mode if <br /> applicable. However, if used in double fill configuration, two vapor return hoses <br /> shall be connected to the dual fill configuration with at least one connection to <br /> each cargo tank(s) used to simultaneously deliver gasoline through two product <br /> hoses into a single tank. <br /> Vapor Recovery Riser Offset <br /> 1. The vapor recovery tank riser may be offset from the tank connection to the vapor <br /> recovery Spill Container provided that the maximum horizontal distance (offset <br /> distance) does not exceed 20 inches. One example of an offset is shown in <br /> Figure 2E. <br /> 2. The vapor recovery riser shall be offset up to 20 inches horizontal distance with <br /> use of commercially available, 4 inch diameter steel pipe fittings. <br /> Tank Gauge Port Components <br /> The tank gauge adaptor and cap are paired. Therefore, an adaptor manufactured by <br /> one company shall be used only with a cap manufactured by the same company. <br /> Connections and Fittings <br /> All connections and fittings not specifically certified with an allowable leak rate shall not <br /> leak. The absence of vapor leaks may be verified with the use of commercial liquid leak <br /> detection solution (LDS) or by bagging, when the vapor containment space of the <br /> underground storage tank is subjected to a non-zero gauge pressure. (Note: leak <br /> detection solution will detect leaks only when positive gauge pressure exists). <br /> Maintenance Records <br /> Each GDF operator/owner shall keep records of maintenance performed at the facility. <br /> Such record shall be maintained on site or in accordance with district requirements or <br /> policies. The records shall include the maintenance or test date, repair date to correct <br /> test failure, maintenance or test performed, affiliation, telephone number, and name of <br /> individual conducting maintenance or test. An example of a Phase I Maintenance <br /> Record is shown in Figure 2F. <br /> Executive Order VR-102-E, OPW Phase I Vapor Recovery System, Exhibit 2, Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.