Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORTH <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN — (Page 2 of 2) <br /> VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING (Check all <br /> that 1 <br /> >: IDC MONITORING 1S PERFORMED USING THE FOLLOWING METHOD(S) <br /> Al CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54a <br /> ❑ 4.NO DISPENSERS ❑ 99.O_TH_E_R_(Specifj) 490-546 <br /> LEAK MONITOR MANUFACTURER: 49Cti55 MODEL k: -TLS —351D 490-56 <br /> LEAK SENSOR MANUFACTURER._ U E E QED — Q OpT 09p S7 MODEL tl(S): "1 y u 3 A e--3 L 3 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. a.YES ❑ b.NO 490-5" <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑ b.NO 490-60 <br /> FAILUREIDISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN a YES ❑ b.NO "- <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a.YES ❑ b.NO 490.6_' <br /> UDC CONSTRUCTION IS 10 I SINGLE WALL ❑ 2.DOUBLE WALL 490.63. <br /> IF DOUBLE WALL: 490-lata. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490-646 <br /> VII. PERIODIC SYSTEM TESTING <br /> L ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65, <br /> LLAK D. CTION E DJ MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR§2644.11 <br /> ® 2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-60-. <br /> ® 3. SPILL BUCKETS ARE TESTED ANNUALLY. 490.67 <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490-69. <br /> ® a.ALARM LOGS C3 b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e-TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f.ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490-6% <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that applt) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 490696. <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-69c. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.694. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 4906%. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-W- <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490.699 <br /> ❑ OTHER(Specify): 490-69h. <br /> 490-M. <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70- <br /> (ICC). The "Designated UST Operator'will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> D The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> D Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> P((ovide additional m nts}�eQr Indicate how m n ages with ditipnal infQrtna i ons ific onitorin ores p� atta hed to this plan. 490-71. <br /> It UT MATH_ V v� M ; GFF 1Ait1RNt LA&E SC:WLZD T<) rN6 5uM lS ENSGK 89 Ao6vvUR*XS�S er-% FMk-S <br /> F v u <br /> XI. PERSONNEL RERPMNRIRTLITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> _by thisplan occurs,2)all condlUons that indicate apossible release are investijzated�and 3.)all monitories records are maintained properly; <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE <br /> NAME: J A S D-1�- L H K D11- 490-7 TITLE: (A EVA gc 4- 490-73, <br /> NAME: C L _ 5V SHfol,ei A- 490.74 TITLE: M EM Pa&= <br /> 490.75, <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE 490-77. <br /> ` PRESENTINGAD 1 Tank OwnerlOperator a 2.Facility Owner/ tar 0 3.Authorized Repreumtative of Owner 490-76 <br /> APPLICANT NAME(print) 490-78:_ APPLICANT TITLE' 490-79 <br /> ICULAECP C• S1tA- ,MX Mem IL <br /> UPCF UST-D(11/2007)-3/4 www.unidocs.org <br />