Laserfiche WebLink
D PROGRAM CONSOLIDATED FIF <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 4911. <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) � FJAJ - 1010101 -1 -11 <br /> 6 �-j I <br /> t• <br /> BUSINESS NAME(Same as Facility Name or DBA) 3. <br /> M oN S'if'IEE pm - ,SKS F-WTE9,P0 SES InrG <br /> BUSINESS SITE ADDRESS 103. 1 CITY 104• <br /> 1100 S. MArits STR-EE MWIE C A q 533q <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions,or annually,whichever is more frequent.Such work must be performed by qualified personnel.(23 CCR§263Z2634,2638,26411 <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY [19Q.OTHER Sp490-3a. <br /> (Specifye�c,,i,fpy')� 490-3b. <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED In CCR§2632,26341 4904. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHODS) that apply) <br /> (Checkau <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,2634] <br /> SECONDARY CONTAINMENT IS: 19,a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490.6. <br /> PANEL MANUFACTURER: VEE DE IZ- KO 0 T 490-7. MODEL#: TLS-3 5 O 490-9' <br /> LEAK SENSOR MANUFACTURER: ER- Q0 T 490-9. MODEL#(S): 0 490-10. <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643] 490-11. <br /> PANEL MANUFACTURER: 49112. MODEL#: 490-13. <br /> W-TANK PROBE MANUFACTURER: 49114. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16' <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.02 h. ❑ c.OTHER490-18. <br /> g•P• &P• (Specify): 49119. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 ccR§2646.1] 49120• <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§26451 TESTING PERIOD: F-] a.36 HOURS Elb.60 HOURS 4904-2�2.z1. <br /> ❑ 5.TANK INTEGRITY TESTING PER(23 CCR§2643.11 49123. <br /> 49124. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 49125. <br /> ❑ <br /> 99.OTHER(Specify): ISUA-L- M0N1102 - 4r1L 4904-27.26. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) hheckall <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> [§2636]] SECONDARY CONTAINMENT IS: Ela.DRY C1 b.LIQUID FILLED El c.PRESSURIZED [Id.UNDER VACUUM 0-v°2v <br /> PANEL MANUFACTURER: V EEDER - (SOOT 490-30. MODEL#: TLS- 350 490-31' <br /> LEAK SENSOR MANUFACTURER: V E6DE2- &OMT 490-32• MODEL#(S): -( _IZ3,- 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. a.YES ❑ b.NO 490-34' <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑ b.NO 490-35. <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 49136. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.(23 CCR§2636] <br /> MLLD MANUFACTURER(S): V M I I F F. PE (,D 490-37" MODEL#(S): 99 LD ZO 00$TP M L p 490-38• <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g p.h.LEAK TESTS.[23 ccR12636] 490-39' <br /> ELLD MANUFACTURER(S): ' 490-40. MODEL#(S): 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: Ela.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-44 <br /> ❑ 4.PIPE INTEGRITY TESTING. 490-45. <br /> 490-46. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-47. <br /> ❑ <br /> S.VISUAL PIPE MONITORING. 490.48. <br /> FREQUENCY: a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490.49. <br /> r •Allowed for vwniy?6M of unburied emergency generator fuel ming only per HSC 25281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(x)(3)1 490-50. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DMSION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 49151. <br /> ❑ <br /> 99.OTHER(Specify) -_ avo-sz. <br /> 490-53. <br /> UPCF UST-D(12/2007)-1/4 www.unidocs.org <br />