Laserfiche WebLink
SWRCB,January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests(if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: KJS ENTERPRISE Date of Testing: 3/27/08 <br /> Facility Address: 1100 S.Main St. Manteca Ca.95336 <br /> Facility Contact: Jessie Chadda I Phone: (209)825-6784 <br /> Date Local Agency Was Notified of Testing: 3/(`x/08 <br /> Name of Local Agency Inspector(if present during testing): Muni Naidu <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company RELIABLE PETROLEUM SERVICES INC. <br /> Technician Conducting Test: Guadalupe Sanchez <br /> Credentials: X CSLB Contractor X ICC Service Tech. ❑SWRCB Tank Tester ❑Other(Spec) <br /> License Number(s): 883706 5250451-UT <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: X Hydrostatic ❑Vacuum ❑Other <br /> Test Equipment Used: Standard Tape Measure Equipment Resolution: <br /> Identify Spill Bucket(By Tank Tl: Unleaded T1: Unleaded T2: Premium Fill T3: Plus Fill <br /> Number, Stored Product, etc. West Fill East Fill <br /> Bucket Installation Type: Direct Bury Direct Bury Direct Bury Direct Bury <br /> X Contained in Sump X Contained in Sump X Contained in Sump Contained in Sum <br /> Bucket Diameter: 12" 12" 12" 12" <br /> Bucket Depth: 14'/" 15%" 15 3/8" 15'/:" <br /> Wait time between applying Imin. lmin. Imin. I min. <br /> vacuum/water and start of test: <br /> Test Start Time(Tj): 11:12 a.m 9:14 a.m 9:21a.m 11:10 a.m <br /> Initial Reading(Ri): 10'/:" 10 5/8" 10'/4" 10'/4" <br /> Test End Time(TF): 12:12 p.m 10:14 a.m 10:21 a.m 12:10 p.m <br /> Final Reading(RF): 10'/z" 10 5/8" 10%" 10%" <br /> Test Duration(TF—Ti): 1 hr. 1 hr. 1 h r. 1 hr. <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or 1/16" 1/16" 1/16" 1/16" <br /> Criteria: <br /> Test Result: X Pass Fail X Pass Fail X Pass Fail X Pass Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> T 1 • West Fill & T3• Plus Fill failed test earlier & Repaired & Cleaned drain <br /> Valves & retested while on site with Inspector- both Spill Buckets passed <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signa�c• Date: 03/27/08 <br /> State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements <br /> may be more stringent. <br />