Laserfiche WebLink
SWRCB,January 2002 Page 2 <br /> r <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: El <br /> Test Method Developed By: Spill Bucket Manufacturer Industry Standard ❑ Professional Engineer <br /> Other(Specify) <br /> Test Method Used: F� Pressure Vacuum Ifl Hydrostatic <br /> Other(Specify) <br /> i <br /> Equipment Used: Equipment Resolution: <br /> Spill Box# 1-87L Spill Box# 1-87R Spill Box# 2-91 Spill Box# 3-89 <br /> Bucket Diameter: 12 12 12 12 <br /> Bucket Depth: 14 14 14 14 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 5 5 5 <br /> starting test: <br /> Test Start Time: 9-20 9:2 0 9:2 0 9:2 0 <br /> Initial Reading(R1 ): 911 911 911 911 <br /> Test End Time: 10:25 10:25 10-25 10:2 5 <br /> Final Reading(RF ): <br /> 911 9if 9tl gig <br /> Test Duration: 60MIN. 60MIN. 60MIN. 60MIN. <br /> Change in Reading(R F-RI ) 0" 0" 0" 0" <br /> Pass/Fail Threshold or PASS PASS PASS PASS <br /> Criteria: <br /> Test Result: Pass 0 Fail Pass 0 Fail Pass E Fail Pass 0 Fail <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> OPW SPILL BUCKETS. <br />