My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1100
>
2300 - Underground Storage Tank Program
>
PR0506504
>
COMPLIANCE INFO 2006 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2019 9:44:41 AM
Creation date
5/10/2019 4:24:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2011
RECORD_ID
PR0506504
PE
2361
FACILITY_ID
FA0007464
FACILITY_NAME
MAIN STREET ARCO AM PM*
STREET_NUMBER
1100
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22119062
CURRENT_STATUS
01
SITE_LOCATION
1100 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dec 08, 10 02:12p Reliable PetroleumA 209-845-8953 p.14 <br /> i - r <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submd minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1 Site map enclosed YES [I NO{_ <br /> 2. Submit copies of 1('.0 Service Technician and/or Installer's certificate and all manufacturer training certificates for <br /> each person instal ng or testing any component that is repaired or replaced. Ensure a copy of the"Site Health <br /> and Safety Plan"is available on the jobsite as required by Title 8. <br /> 3_ Detailed descriptio i of work to be completed_ List components to be repaired or replaced and attach a diagram <br /> drawn to scale shc Ning location of repairs and/or replacements- If repairing a component, describe how this will <br /> be done. (If addi Ig piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST <br /> Installation Applica ion pages 4-8 as necessary for a timelyan review): <br /> S _ 3 0 bA- Y �Uj <br /> C- PLA CS6 0' <br /> PLO I)-16rLda 'S';�-2 <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party aRproval): <br /> U� E CZ 66-0'rd- <br /> Ua #39-3 3 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.