Laserfiche WebLink
ACDF-H,August 2003 Page of <br /> 7, UNDER-DISPENSER CAINLi�N11IENT Ill TESTIFNG <br /> Test Method Developed 13y: ❑UDC Manufacturer 0 Industry Standard x Professional Engineer <br /> ❑Other(Sped) <br /> Test Method Used: ❑Pressure ❑Vacuum x Hydrostatic <br /> ❑Other(,Sped) � M <br /> Test.Equipment Used:In-Con TS-STS Equipment Rcsolution:+_.002" <br /> C)bC# UDC# <br /> UDC Manufacturer. <br /> UDC Material: _ <br /> UW_ Total Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: t� <br /> Height.from UDC Bottom to - <br /> Lowest Electrical Yenmtion: <br /> Condition of UDC prior to <br /> Depth of LTDC Tested <br /> Does turbine shut down when wn _ <br /> UDC sensor detects liquid(both. X Yes ❑No ❑NA Yes ❑No D NA ❑Yes ❑No ❑NA 2 Yes ❑Nu ❑NA <br /> product and water)?' <br /> TTu-bine shutdown response time "µ <br /> Is system programmed for fail. -- <br /> safe shutdown?' 'A Yes Ll No ❑NA Yes ❑No ❑NA ❑Yes !No ❑NA I ❑Yes +:]No ❑NA <br /> Was fail-safe verified to be— <br /> t <br /> opera4, l?' ❑Yes JKNo DNA ❑Yes ANo ❑NA Yes ❑No DNA ❑Yes ❑No ❑NA <br /> Wait time between applying w- <br /> pressure/vacuum/water and <br /> starting tit s� <br /> Test Start Time: w u � <br /> Initial lteadin <br /> Test End Time. <br /> Final Readin ,(itt). Z.(� <br /> Test Duration: <br /> Change in <br /> Pass/Fail Threshold or Criteria: <br /> eat Rsakt: _ Pass C1 Pail ass p Fail ❑ bass ❑Waif ❑ )Sass C�Fail <br /> VVas sensor removed for testing? 17 Yes u No ❑NA I�Yes ❑No ❑NA Yes ❑No C NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced aid <br /> fmiuk"rtl after testin ? ❑ Yes No CNA fd Yes ❑No ❑NA �j Yes D No ❑NA 0 Yes ❑No ❑NA <br /> COMMeRt3—(include irr orniutiari vn re .airs made prior to tesft and recommended ollvw�up ar ailed tests) <br />