My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2012 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1100
>
2300 - Underground Storage Tank Program
>
PR0506504
>
BILLING 2012 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:57:18 AM
Creation date
5/13/2019 10:39:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2012 - 2015
RECORD_ID
PR0506504
PE
2361
FACILITY_ID
FA0007464
FACILITY_NAME
MAIN STREET ARCO AM PM*
STREET_NUMBER
1100
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22119062
CURRENT_STATUS
01
SITE_LOCATION
1100 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIED PROGRAM CONSOLIDATED FOIRWI <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Pae 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1• <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2• <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) - 1 G 1 <br /> Ir-INI - 10101 D <br /> BUSINESS NAME(Same as Facility Name or DBA) 3. <br /> INAAWA 5,19,FE-T A4, LO WOM -- Jsl<S P-KTEASKISEs 114C. <br /> BUSINESS SITE ADDRESS 103. CITY 104. <br /> loo S. MAIN STPLEET MAKTEc-A CA 95 33 <br /> H. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions,or annually,whichever is more frequent.Such work must be performed by qualified personnel.[23 ccx§2632,2634,263s,26411 <br /> 490-3a. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 490-3b. <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634] 490.4. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> (Ch <br /> IV. <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5- <br /> WITH AUDIBLE AND VISUAL ALARMS.123 CCR 12632.26341 e <br /> SECONDARY CONTAINMENT IS: X a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: yE E Q CVL- ALO 0 T 490-7' MODEL#: T LS --35 O 4904• <br /> LEAK SENSOR MANUFACTURER: V EE QE Q -(LOO? 490-9' MODEL#(S): go 490-10. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§26431 490-11. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13' <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): ago 1s. ;•1t <br /> LEAK TEST FREQUENCY: Ka.CONTINUOUS [Ib.DAILY/NIGHTLY ❑ c.WEEKLY 490-16• <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHERS ci 490 18 <br /> g•P• g.p.h. (Specify): a90-19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.11 490-20, <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[2.3 CCR§26451 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490490 21. F <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.11 490-23• <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHERSc' 490.24' <br /> Q ) 490-25. <br /> ❑ <br /> 99.OTHER(Specify): 1 SU A L MON 1 TO RO N Cs -- D A%L. 490-27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHODS) hatapply <br /> ( ck all <br /> 12L.1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> [§2636] SECONDARY CONTAINMENT'IS: ❑ a.DRY E] b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM ago 29. <br /> PANEL MANUFACTURER: V eay fry„ ^ �LO O T 490-30. MODEL#: TI.S 1$-M 490.31. <br /> LEAK SENSOR MANUFACTURER: )(E E n R Rp p r 490-32. MODEL#(S): <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. a.YES ❑ b.NO 410-34- <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. )!�.a.YES ❑ b.NO 490-"- <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36- <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§26361 <br /> MLL_D_MANUFACTURER(S): \ M U FE Q E-T Q.O 490.37. MODEL#(S): g9 L p Z 0 0 0 Sj P n=,D 490 31. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.123 CCR§26361 490-39. <br /> ELLD MANUFACTURER(S): 490.40. MODEL#(S): 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: Ela.MINIMUM MONTHLY 0.2 g p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49043. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-M. <br /> ❑ 4.PIPE INTEGRITY TESTING. 490-45. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) a X7.46. <br /> ❑ 5.VISUAL PIPE MONITORING. 49048. <br /> FREQUENCY: a.DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 49(�49- <br /> 'AlloweA for monitoring ofunburied emergency generator fuel pipi_g only per HSC 525281.5(bZ(3) _ <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(ax3)] 490-50. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51• i <br /> ❑ <br /> 99.OTHER(Specify) 490-52. <br /> 490-53. <br /> UPCF UST-D(12/2007)-1/4 www.unidoes.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.