My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 2:51:21 PM
Creation date
5/15/2019 9:33:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WIFIED PROGRAM CONSOLIDATED FORD' <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(page 1 of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE S 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490.2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br /> I. FACILITY INFORMATION <br /> FACILITY M#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) Safeway Fuel Station 2707-10 3. <br /> BUSINESS SITE ADDRESS 6425 Pacific Ave. -0-1.CITY Stockton 104' <br /> EL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detector;,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and chat such work must be performed by qualified personnel. <br /> 23 CCR 2632,2634,2638,2641) <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): 490-3. <br /> M.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. X 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)4901 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490.5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: S a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490'4 <br /> PANEL MANUFACTURER Veeder Root TLS-350R 4904. MODEL#: 848290-012 4963 <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-9' MODEL#:794390-460 490-10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(n(23 CCR§2643) 49x11 <br /> PANEL MANUFACTURER 49011 MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER 49014. MODEL#(S): 490-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIGHTLY ❑ a WEEKLY 49016 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify). 490-17 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 gp.h., ❑ c.OTHER(Specify): °49900_�y <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 69020 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§26451 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21 <br /> 490.22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490.23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490.24 <br /> 490.25 <br /> ❑ <br /> 99.OTHER (Specify): . . 490-26 <br /> 49x27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Cheek all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490.29 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:S&DRY ❑b.LIQUID FILLED [1c.PRESSURIZED ❑d.UNDER VACUUM 490x9 <br /> PANEL MANUFACTURER Veeder Root TLS-350 990'30 MODEL#: 848290-012 490-31 <br /> LEAK SENSOR MANUFACTURER Veeder Root °9°x2 MODEL#:794380-208 490.33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. S a.YES ❑b.NO 49-134 <br /> FAILUREMISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. M a YES ❑b.NO 49635 <br /> 2.MECHANICAL LINE LEAK DETECTOR(mLLD)THAT ROUTINELY PERFORMS 3.0 g.ph.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK LS DETECTED CCR 263 49 W <br /> MLLD MANUFACTURER(S): 490-37 MODEL#(S): 49038 <br /> S 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2616) 49039 <br /> ELLD MAM)FACTURE S Veeder Root 490'40' MODEL#(S): 848480-001 490.41 <br /> PROGRAMMED IN LINE LEAK TEST: S 1.MINIMUM MONTHLY 0.2 g p.h. S 2.MINIMUM ANNUAL 0.1 g p.h. 09012 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. X a.YES ❑b.NO 490x3 <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. x a YES ❑b.NO 490-44 <br /> ❑ 4.PIPE INTEGRITY TESTING 490.45 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHERS CCI 490/6490.47 <br /> 5.VISUAL PIPE MONITORING. 490-08 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MON.MONTHLY&EACH TIME SYSTEM OPERATED" 49019 <br /> �Aaowed Po,7PWt,rM ofunduied mmwcy genmtor Pool pi*2 mly W ASC 25261.5 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA(23 CCR§2636(a)(3)1. 490.50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490.51 <br /> ❑ 99.OTHER(Specify) _ - 490.M <br /> 490.53 <br /> UPCF UST-D(122007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.